Project experience

Major Projects

A searchable register of engineering, consultancy, construction, maintenance and technical service assignments.

1250Projects listed
39Client organisations
2015-2026Project years
1250 projects
1250
SABIC2026PO / Contract: 4300751450Ongoing

Corrosion Inhibitors Service

1249
Ma’aden2026PO / Contract: M-202608447-1Ongoing

Ma’aden Phosphate air duct and plumbing projects modeled in 3D in Navisworks

TEFKEN Construction

1248
Ma’aden2026PO / Contract: M-202607020-1Ongoing

Ma’aden Phosphate 3 Phase 1 Project at WAS Piping

TEFKEN Construction

1247
SATORP2025PO / Contract: 4100007068Completed

Design,Buid and supply, Mataellic Rack Storage 06 units for the refinary operations.

Repeat Order for Refinary operations.

1246
HADEED - RAJHI STEEL2025PO / Contract: 1400000032Ongoing

CG After cooler Chiller Project    

Saudi Iron & Steel Company (HADEED)

1245
SIPCHEM2025PO / Contract: MISCL-2025-331-1Ongoing

Engineering Design and BOQ for 110V to 220V Conversion Project 11 Buildings

MULTIFIX

1244
MARASI MARINE2025PO / Contract: ContractCompleted

Design of a 150 kN Bollard Pull Bitt at Jubail Industrial Port for Marasi Marine Shipyard Co.

King Fahd Industrial Port

1243
SATORP2025PO / Contract: 4100007037Completed

Design,Buid and supply, Mataellic Rack Storage 06 units for the refinary operations.

Refinary operations.

1242
SABIC2025PO / Contract: 4300719542Ongoing

Design, procurement, and construction of a De-coke Drum, including replacement with REDOX@600 material at the furnace outlet.

SAUDI KAYAN Petrochemical Co.

1241
Saudi Coustom2025PO / Contract: NGI-0800002Completed

38 ware house of Saudi Coustom RFP Design and contractors

Idrees Petrolium, Next Gen Infra, Aljihaz Holding

1240
UACC2025PO / Contract: COC/UACC/0001Completed

Design and supervison of Sales Gas pipe line for UACC

1239
SIPCHEM2025PO / Contract: CW13628Ongoing

SIPCHEM, TECHNICAL MASTER SERVICE AGREEMENT, (Contract No. CW 13629, SAP Agreement No. 4600002241) . 3 Years

1238
SABIC2025PO / Contract: RAS.2025.111Completed

HVAC Platofrm Design for SABIC Headquarter Building/Shapoorji Pallonji

RAS AMBITION

1237
ANC2024PO / Contract: ANC-PO-4500062082Completed

Preparation of Shop Drawings

1236
ARAMCO2024PO / Contract: OG-001/NPCL-IS-OG-VRU/SA/0398Completed

MTO Preparation & Bid Estimation Support for 16 Bulk Plants

NESMA

1235
ARAMCO2024PO / Contract: OG-001/NPCL-IS-OG-GOSP/SA/0379Completed

MTO Preparation & Bid Estimation Support for 31 GOSP

NESMA

1234
SIPCHEM2024PO / Contract: 4500134804Completed

Flexibility Analysis to replace Ethylene Vertical pump with New Submersible Centrifugal type Pump

1233
TASNEE2023PO / Contract: CW10516Ongoing

CRANES AND ALLIED SERVICES, 3 Years

1232
SIPCHEM2023PO / Contract: 4500131568Completed

STRESS ANALYSIS FOR SUCTION/DISCHARGE PIPING OF COMPRESSOR 11-C-2201 IN IDC PLANT

1231
MARAFIQ2023PO / Contract: 9100026331Completed

RO-4 Sea Water Desalination Plant Base Line HAZOP

1230
SABIC2023PO / Contract: 4300592691Completed

LV-591180-2 ASU Condenser Control Valve Performance

AR-RAZI affiliate

1229
National Lead Smelting Company2023PO / Contract: 4800022865Completed

Configuration and testing of telecom towers, ensuring optimal signal transmission and connectivity for mobile, radio, and satellite systems.

1228
National Lead Smelting Company2023PO / Contract: 4800011423Completed

Implementation of building automation systems (BMS) for centralized control over HVAC, lighting, and other essential infrastructure.

1227
SABIC2023PO / Contract: Not statedCompleted

Flexibility analysis for Underground Cooling Water Supply and Retrun RTR line JUBAIL AND YANBU

Fiberglass Structural Engineering, Inc.

1226
SABIC2023PO / Contract: 4300577928Completed

Revamping of Demineralizer Plant -Hadeed

Saudi Iron & Steel Company (HADEED)

1225
SIPCHEM2023PO / Contract: 4500123179Completed

Lightning protection design for IGC plant

1224
Technical Tetravalent Lead Smelting Plant2023PO / Contract: 4800022355Completed

Data center setup and maintenance, ensuring high availability and reliability of critical IT infrastructure and systems.

1223
Rassas2023PO / Contract: 4800024056Completed

Design and installation of structured cabling systems, ensuring that network infrastructures are flexible, scalable, and reliable.

1222
Technical Tetravalent Lead Smelting Plant2023PO / Contract: 4800012987Completed

Installation of integrated access control systems, providing advanced security features and real-time monitoring of facility entrances.

1221
National Lead Smelting Company2023PO / Contract: 4800013874Completed

Telecom tower and mast installation for wireless coverage, supporting mobile, radio, and network transmission systems.

1220
Rassas2023PO / Contract: 4800011442Completed

Deployment and management of network security, firewalls, and cybersecurity compliance systems to protect digital assets.

1219
Technical Tetravalent Lead Smelting Plant2023PO / Contract: 4800011854Completed

Operational checks of motorized dampers and actuators, ensuring ventilation systems function correctly.

1218
SIPCHEM2023PO / Contract: 4500123234Completed

Flexibility analysis for new 8# dual flow BFW (Boiler Feed Water) between Phase-1 & Phase-2

1217
AL Bilad Catalyst2023PO / Contract: PO/3/23Completed

Storm water network Design as per RC requirments and Topographical Survery of Al-Bilad

1216
Technical Tetravalent Lead Smelting Plant2023PO / Contract: 4800012457Completed

Replacement of air filters and belt alignment in AHUs and FCUs, maintaining HVAC performance.

1215
Rowad Global Packaging Company2023PO / Contract: 4800012624Completed

Control panel refurbishment and rewiring, extending panel lifespan and accommodating upgrades.

1214
Rowad Global Packaging Company2023PO / Contract: 4800010869Completed

Fiber optic splicing, termination, and backbone testing, supporting high-speed communication infrastructure and data transmission.

1213
Rowad Global Packaging Company2023PO / Contract: 4800010477Completed

CMMS-based maintenance support using Computerized Maintenance Management System for planned and corrective actions.

1212
Rowad Global Packaging Company2023PO / Contract: 4800010362Completed

Cable termination and glanding for LV/MV systems, ensuring secure connections and proper insulation.

1211
Taldeen Plastic Solution2023PO / Contract: 4800010215Completed

Electrical LV/MV switchgear servicing, supporting reliable power distribution and system protection.

1210
SABIC2022PO / Contract: 4300430816Completed

Third party inspection of AlManar Camp

Petrokemya North affiliate

1209
SABIC2022PO / Contract: 4300430835Completed

Third party inspection of AlManar Camp

Petrokemya North affiliate

1208
ARAMCO2022PO / Contract: PO-PTS-3284-22Completed

Design and Engineering of Diesel, Gasoline and Spill Container Tank for Marjan and Zulf TCF Project

PT-Steel

1207
SABIC2022PO / Contract: 4300477573Completed

3EG/3UTLTAM 2022 Rigging Services

1206
SABIC2022PO / Contract: 4300477578Completed

1EG/1UTL TAM 2022 Rigging Services

Sharq Eastern Petrochemical Company

1205
ARAMCO2022PO / Contract: AC090WOD2000001Completed

BOQ Estimation for New substation ADGOSP-3, ADGOPS-6, SHGOSP-1_ ARAMCO

Larsen & Toubro (L&T)

1204
Rowad Global Packaging Company2022PO / Contract: 4600025697Completed

Installation of point-to-point and point-to-multipoint wireless communication systems, providing flexible and reliable connectivity.

1203
SIPCHEM2022PO / Contract: 4500119607Completed

Piping Stress Analysis-Re- Boiler Replacement

1202
SIPCHEM2022PO / Contract: 4500116712Completed

Civll/Structural Assessment sea water pump foundation (51-P1101A/B)

1201
SABIC2022PO / Contract: 4300495346Completed

Water Chillers Supply And Replacement

Saudi Iron & Steel Company (HADEED)

1200
SIPCHEM2022PO / Contract: 4500107423Completed

Shutdown Manpower Services, East Park

1199
Rowad Global Packaging Company2022PO / Contract: 4600025745Completed

Setup of fiber optic cable infrastructure for high-speed data transfer, ensuring minimal latency and maximum performance for communication networks.

1198
NBC (National Batteries Company)2022PO / Contract: 4600024332Completed

CCTV camera and NVR system installation, ensuring effective surveillance and secure video storage for monitoring and event analysis.

1197
Taldeen Plastic Solution2022PO / Contract: 4600024754Completed

Network security and firewall management, ensuring comprehensive protection against cyber threats and ensuring regulatory compliance.

1196
NBC (National Batteries Company)2022PO / Contract: 4600024188Completed

Installation and optimization of wireless network infrastructure, enabling efficient data transfer and mobility for business operations.

1195
Taldeen Plastic Solution2022PO / Contract: 4600024142Completed

Passive Optical LAN (POL) solution deployment, reducing energy use and increasing network efficiency in large facilities.

1194
NBC (National Batteries Company)2022PO / Contract: 4600024521Completed

IP telephony (VoIP), network switch setup, and configuration, enabling reliable voice and data communication.

1193
Taldeen Plastic Solution2022PO / Contract: 4600023952Completed

Routine maintenance of access card readers and door locks, ensuring reliable entry control.

1192
Taldeen Plastic Solution2022PO / Contract: 4600022784Completed

Lighting automation system servicing, maintaining programmable schedules for energy conservation.

1191
Taldeen Plastic Solution2022PO / Contract: 4600022681Completed

Maintenance and cleaning of lighting panels and fixtures, improving illumination and electrical safety.

1190
Taldeen Plastic Solution2022PO / Contract: 4600023112Completed

Building automation system (BAS) servicing, optimizing control over building utilities and energy efficiency.

1189
National Lead Smelting Company2022PO / Contract: 4600022009Completed

Generator operation and preventive maintenance, ensuring backup power systems remain reliable and functional.

1188
Rassas2022PO / Contract: 4600022335Completed

Thermal scanning and inspection of electrical panels, identifying hotspots and preventing electrical failures.

1187
National Lead Smelting Company2022PO / Contract: 4600022561Completed

Security system operation and CCTV monitoring, maintaining facility safety through surveillance and access control.

1186
TASNEE Downstream2022PO / Contract: 9000000962Completed

Long Term Contract- ARC Contract (3 Years)

1185
SABIC2021PO / Contract: 4300463266Completed

Supply Rigger-1 & Rigger-3

Sharq Eastern Petrochemical Company

1184
SABIC2021PO / Contract: 4300464738`

Wind breaker Maintenance Service Contract (LONG TERM CONTRACT)

Saudi Iron & Steel Company (HADEED)

1183
SABIC2021PO / Contract: PR# 3000218421Completed

Roof Insulation of TPS Building 1-2-3, SHARQ-Additonal Scope

Sharq Eastern Petrochemical Company

1182
JANA2021PO / Contract: 4500038798Completed

Shutdown Manpower Services

1181
SIPCHEM2021PO / Contract: 4500112360Completed

Piping Stress Analysis-Sulphur Strip Project

1180
SIPCHEM2021PO / Contract: 4500110960Completed

Revalidation of Piping Stress Analysis for PDH Plant

1179
RIG (Rowad International Geosynthetics Company)2021PO / Contract: 4600019019Completed

Full-scale installation of CCTV, IP cameras, and NVR systems for round-the-clock monitoring and automated event documentation.

1178
Taldeen Plastic Solution2021PO / Contract: 4600019385Completed

Satellite and VSAT system installation, providing remote connectivity for global communications and isolated areas.

1177
Rassas2021PO / Contract: 4600019775Completed

Wireless network configuration, optimizing data transmission speed and coverage across enterprise and industrial environments.

1176
ARAMCO2021PO / Contract: LEAP/COC/21/5246Completed

Detail Design and Engineering for Telecommunication Cable Routing and Duct bank deisgn for Smart Safety soultion for TANAJIB gas Plant

Leap Arabia

1175
Wison Engineering Ltd. 2021PO / Contract: WISON-17093-S21-032Completed

Third Party Inspection- COVID 19 for TCC/KCC/REBA

1174
Wison Engineering Ltd. 2021PO / Contract: WISON-17093-S21-028Completed

Third Party Inspection- COVID 19

1173
RIG (Rowad International Geosynthetics Company)2021PO / Contract: 4600019006Completed

Deployment of optical fiber infrastructure for high-capacity data transmission, supporting modern communication and technology solutions.

1172
RIG (Rowad International Geosynthetics Company)2021PO / Contract: 4600019254Completed

Configuration and management of LAN/WAN infrastructure, enabling reliable and secure network operations for businesses of all sizes.

1171
RIG (Rowad International Geosynthetics Company)2021PO / Contract: 4600018231Completed

Wireless infrastructure setup for point-to-point and point-to-multipoint systems, enabling flexible network expansion.

1170
RIG (Rowad International Geosynthetics Company)2021PO / Contract: 4600018954Completed

AI-based surveillance and smart site monitoring solutions, ensuring proactive threat detection and real-time analytics.

1169
National Lead Smelting Company2021PO / Contract: 4600017896Completed

Maintenance of public address and voice evacuation systems, ensuring clear communication during emergencies.

1168
National Lead Smelting Company2021PO / Contract: 4600021980Completed

Maintenance of variable frequency drives (VFDs), ensuring efficient motor control and system reliability.

1167
RIG (Rowad International Geosynthetics Company)2021PO / Contract: 4600021568Completed

Earthing and lightning protection system inspection, maintaining grounding integrity and safety compliance.

1166
RIG (Rowad International Geosynthetics Company)2021PO / Contract: 4600021487Completed

BMS schedule and logic tuning, adjusting time-based operations for HVAC and lighting to improve energy efficiency.

1165
Technical Tetravalent Lead Smelting Plant2021PO / Contract: 4600021459Completed

Access control system maintenance and programming, ensuring secure and controlled entry to restricted areas.

1164
SABIC2021PO / Contract: 4300415919Completed

Roof Insulation of TPS Building 1-2-3, SHARQ

Sharq Eastern Petrochemical Company

1163
Al JAZEERA2021PO / Contract: JAZ/0804/2021Completed

Detail Design and Engineering for Natural gas line.

1162
Advance Petrochemcals 2021PO / Contract: 4500023381Completed

TAM Manpower Services

1161
RIG (Rowad International Geosynthetics Company)2021PO / Contract: 4600021399Completed

Busbar system inspection and tightening, maintaining conductivity and reducing the risk of electrical faults.

1160
Rowad Global Packaging Company2021PO / Contract: 4600021362Completed

HVAC system maintenance including chillers, ducting, and package units, ensuring efficient climate control and system performance.

1159
TASNEE2021PO / Contract: 4600021066Completed

Cleaning and servicing of switchgear compartments, improving lifespan and safe operation of electrical equipment.

1158
Saudi Acrylic Acid Company2021PO / Contract: 4600020955Completed

RTR system pressure testing and documentation, verifying performance under design pressure and ensuring compliance with specifications.

1157
EAST GAS2021PO / Contract: EGCL/055/2021Completed

Construction of NG pipeline networks, fiber optic cables and Metering station in Dammam 2nd Industrial City for Arab Paper Manufacturing Company (WARAQ)

1156
SAPCO (Saudi Acrylic Polymer Company)2021PO / Contract: 4600020897Completed

Fire suppression system installation and commissioning, including sprinklers and clean agent systems, during shutdowns or system upgrades.

1155
Saudi Butanol Company2021PO / Contract: 4600020621Completed

Fire alarm system integration with DCS/PLC systems, ensuring immediate alerting and control in emergency situations during shutdowns or turnarounds.

1154
ARAMCO2021PO / Contract: LEAP/COC/21/4036Completed

Updation of E&I and Telecommunication Drawings for Marjan GOSP-2 &3 and Zulf GOSP 4- MACDERMOTT - ARAMCO

Leap Arabia/ MACDERMOTT

1153
ARAMCO2021PO / Contract: LEAP/COC/21/4021Completed

Updation of E&I and Telecommunication Drawings for TANAJIB Gas Plant- ARAMCO

Leap Arabia

1152
ARAMCO2021PO / Contract: LEAP/COC/22/1031Completed

Updation of E&I and Telecommunication Drawings for Zulf 450/459 -Larsen & Toubro (L&T)/ARAMCO

Leap Arabia/ Larsen & Toubro (L&T)

1151
Saudi Polyolefin Company2021PO / Contract: 4600020555Completed

Testing and verification of backup systems (e.g., backup DCS/PLC systems and emergency power supply), ensuring readiness during turnarounds.

1150
Saudi Butanol Company2021PO / Contract: 4600020265Completed

Routine inspection and servicing of valves, actuators, and control systems, performed during scheduled shutdowns and plant turnarounds.

1149
SAPCO (Saudi Acrylic Polymer Company)2021PO / Contract: 4600020193Completed

DCS/PLC panel installation and termination, including small modifications and upgrades during shutdowns or as part of long-term maintenance contracts.

1148
Saudi Acrylic Acid Company2021PO / Contract: 4600016987Completed

Site development and leveling for plant expansion through grading and site preparation for plant expansion projects.

1147
Saudi Acrylic Acid Company2021PO / Contract: 4600016876Completed

Cable trench excavation and duct bank installation involving excavation and installation of cable trenches and duct banks.

1146
Saudi Polyolefin Company2021PO / Contract: 4600016577Completed

Structural steel erection and alignment for industrial infrastructure.

1145
SAPCO (Saudi Acrylic Polymer Company)2021PO / Contract: 4600016526Completed

Valve installation, testing, and stroke calibration.

1144
SEPC (Saudi Ethylene and Polyethylene Company)2021PO / Contract: 4600016412Completed

RTR/GRP piping repair, testing, and commissioning.

1143
SABIC2021PO / Contract: 4300403816Completed

Third Party Inspection- COVID 19

1142
SABIC2021PO / Contract: 4300403835Completed

Third Party Inspection- COVID 19

Sharq Eastern Petrochemical Company

1141
SIPCHEM2021PO / Contract: 4500107158Completed

TAM Manpower Services for EA, IPC, IUC Plants

1140
SIPCHEM2021PO / Contract: 4500106633Completed

Shutdown Manpower Services for IVC Plant

1139
TASNEE2020PO / Contract: 4500097678Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1138
TASNEE2020PO / Contract: 4500097698Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1137
TASNEE2020PO / Contract: 5500039586Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1136
TASNEE2020PO / Contract: 5500039647Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1135
TASNEE2020PO / Contract: 4500097830Completed

Under Three-Year Long-Term ARC Contract at RIG Plant

1134
TASNEE2020PO / Contract: 5500039711Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1133
TASNEE2020PO / Contract: 5500040117Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1132
TASNEE2020PO / Contract: 4500098498Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1131
TASNEE2020PO / Contract: 4500098524Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1130
TASNEE2020PO / Contract: 4500098616Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1129
TASNEE2020PO / Contract: 4500098619Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1128
TASNEE2020PO / Contract: 5500040288Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1127
TASNEE2020PO / Contract: 5500040331Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1126
SABIC2020PO / Contract: 5500040342Completed

Shutdown maintenance of piping, mechanical equipment, electrical systems and field instrumentation.

1125
SABIC2020PO / Contract: 5500040116Completed

Fabrication and installation of equipment-support steel structures.

1124
SABIC2020PO / Contract: 4801792358Completed

Rel. ord. against contract 4600038764 Item 00020, to do inspection for Supplier's accommodation: KNK camp.

SAUDI KAYAN Petrochemical Co.

1123
SABIC2020PO / Contract: 4801795139Completed

Rel. ord. against contract 4600038764 Item 00020, to inspect the construction contractors M/S HKSS Camp at Jubail

Sharq Eastern Petrochemical Company

1122
SABIC2020PO / Contract: 4801795395Completed

Rel. ord. against contract 4600038764 Item 00020 Suppliers Names:KANOO, E&H, NABA

IBN ZAHR Saudi European Petrochemical

1121
SABIC2020PO / Contract: 4801796010Completed

Rel. ord. against contract 4600038764 Item 00020 To conduct the audit assessment of the Contractor (GISCO) camps in Jubail .

Albayroni Al-Jubail Fertilizer Co

1120
SABIC2020PO / Contract: 4801796011Completed

Rel. ord. against contract 4600038764 Item 00020 To conduct the audit assessment of the Contractor (Saudi DAZ) camps in Jubail .

SAFCO affiliate

1119
NBC (National Batteries Company)2020PO / Contract: 4500152426Completed

Access control system maintenance, ensuring continuous monitoring and secure entry points for authorized personnel only.

1118
NBC (National Batteries Company)2020PO / Contract: 4500152159Completed

Installation of network firewalls and security protocols to safeguard data transmission and ensure compliance with industry standards.

1117
SIPCHEM2020PO / Contract: 4500105045Completed

Piping Stress Analysis for Reactor Vent lines

1116
JANA2020PO / Contract: 4500039465Completed

Shutdown Manpower Services

1115
National Lead Smelting Company2020PO / Contract: 4500152357Completed

Public address and general alarm system setup, ensuring clear communication during emergencies and providing real-time alerts to occupants.

1114
National Lead Smelting Company2020PO / Contract: 4500147879Completed

Integration of advanced network monitoring systems, providing real-time analytics and proactive management of network health.

1113
Rassas2020PO / Contract: 4500152951Completed

Design and implementation of secure IP telephony systems, ensuring efficient communication while maintaining robust voice and data security.

1112
Technical Tetravalent Lead Smelting Plant2020PO / Contract: 4500149596Completed

Inside Plant (ISP) fiber termination and patch panel management, maintaining organized and efficient fiber infrastructure.

1111
National Lead Smelting Company2020PO / Contract: 4500152963Completed

Satellite and VSAT connectivity setup, enabling remote communication for off-grid or isolated sites.

1110
Rassas2020PO / Contract: 4500152753Completed

Cleaning and inspection of solar panel systems, maintaining energy output and efficiency.

1109
Rassas2020PO / Contract: 4500151988Completed

Inspection and flushing of HVAC chilled water pipelines, preventing blockages and ensuring cooling efficiency.

1108
FARABI2020PO / Contract: TG-2020-00020703-3Completed

Tank Venting Design Calculations and Nozzle Fabrication drawings for Farabi

TAMIMI

1107
Rowad global packaging2020PO / Contract: 4500074620Completed

Shutdown Manpower Services

1106
Technical Tetravalent Lead Smelting Plant2020PO / Contract: 4500151011Completed

Breaker testing and relay calibration in switchgear panels, ensuring protective devices function accurately.

1105
RIG (Rowad International Geosynthetics Company)2020PO / Contract: 4500149490Completed

Fire detection and suppression system maintenance, ensuring safety compliance and operational readiness.

1104
Taldeen Plastic Solution2020PO / Contract: 4500147944Completed

Janitorial and sanitation services in industrial zones, maintaining hygiene standards and operational cleanliness.

1103
Rassas2020PO / Contract: 4500151245Completed

Replacement of damaged conduits and cable trays, ensuring safe cable routing and support.

1102
Rassas2020PO / Contract: 4500152885Completed

BMS device connectivity and integration checks, maintaining seamless communication between sensors and control units.

1101
Rassas2020PO / Contract: 4500151608Completed

Landscaping and green area maintenance, enhancing environmental aesthetics and compliance with site upkeep standards.

1100
TASNEE2020PO / Contract: 4500147857Completed

Thermal scanning and inspection of electrical panels, identifying hotspots and preventing electrical failures.

1099
Saudi Butanol Company2020PO / Contract: 4500147157Completed

Laying of underground RTR lines with sand padding, protecting the pipe system and maintaining alignment and stability.

1098
Saudi Acrylic Acid Company2020PO / Contract: 4500145739Completed

Fire suppression system maintenance, performing regular checks on equipment such as nozzles and valves to ensure reliable operation.

1097
Saudi Acrylic Acid Company2020PO / Contract: 4500145429Completed

BMS installation and integration, controlling HVAC, lighting, and other critical systems during maintenance and plant shutdowns.

1096
SEPC (Saudi Ethylene and Polyethylene Company)2020PO / Contract: 4500143868Completed

System optimization and fine-tuning during plant turnarounds, ensuring all instruments and control systems meet peak performance levels.

1095
SAPCO (Saudi Acrylic Polymer Company)2020PO / Contract: 4500136979Completed

Instrumentation troubleshooting and fault detection, ensuring smooth plant operations during critical shutdown periods.

1094
EAST GAS2020PO / Contract: EGCL/097/2020Completed

Calibration of transmitters and gauges, ensuring accurate measurement and reliable system performance during plant shutdown and routine calibration checks.

1093
SEPC (Saudi Ethylene and Polyethylene Company)2020PO / Contract: 4500099806Completed

Instrumentation cabling and tray installation, ensuring safe routing for field devices and systems during maintenance, shutdown, or upgrades.

1092
SEPC (Saudi Ethylene and Polyethylene Company)2020PO / Contract: 4500099763Completed

Control room and substation building repairs for restoration and repair of control rooms and substation buildings.

1091
Saudi Acrylic Acid Company2020PO / Contract: 4500099762Completed

Mechanical equipment installation for process and utility skids.

1090
SEPC (Saudi Ethylene and Polyethylene Company)2020PO / Contract: 4500073635Completed

Fabrication and erection of pipe supports and racks.

1089
SAPCO (Saudi Acrylic Polymer Company)2020PO / Contract: 4500071658Completed

Carbon steel utility piping fabrication and installation, including spool and field works.

1088
JANA2020PO / Contract: 4500034979Completed

Preparation of Isometrics Drawings for JANA Pipelines to PORT and other Companies

1087
SADARA2020PO / Contract: 4700002021Completed

Drain line Project

1086
SABIC2020PO / Contract: 4801786258Completed

Third Party Inspection- COVID 19

Ibn Al-Baytar affiliate

1085
SABIC2020PO / Contract: 4503897545Completed

Rel. ord. against contract 4600038764 Item 00020

1084
TASNEE2020PO / Contract: 4800016261Completed

13 Nos. Future Tie In Projects

1083
Taldeen Plastic Solution2019PO / Contract: 5500027813Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1082
Taldeen Plastic Solution2019PO / Contract: 5500027834Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1081
Taldeen Plastic Solution2019PO / Contract: 5500027839Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1080
Taldeen Plastic Solution2019PO / Contract: 5500027877Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1079
Taldeen Plastic Solution2019PO / Contract: 5500027886Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1078
Taldeen Plastic Solution2019PO / Contract: 5500027887Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1077
Taldeen Plastic Solution2019PO / Contract: 5500027888Completed

Under Three-Year Long-Term ARC Contract at SAAC

1076
Taldeen Plastic Solution2019PO / Contract: 5500027889Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1075
Taldeen Plastic Solution2019PO / Contract: 5500028028Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1074
Taldeen Plastic Solution2019PO / Contract: 5500028052Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1073
Taldeen Plastic Solution2019PO / Contract: 5500028056Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1072
Taldeen Plastic Solution2019PO / Contract: 5500028069Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1071
Taldeen Plastic Solution2019PO / Contract: 5500028085Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1070
Taldeen Plastic Solution2019PO / Contract: 5500028093Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1069
Taldeen Plastic Solution2019PO / Contract: 5500028107Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1068
Taldeen Plastic Solution2019PO / Contract: 5500028108Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1067
Taldeen Plastic Solution2019PO / Contract: 5500028110Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1066
Taldeen Plastic Solution2019PO / Contract: 5500028181Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1065
Taldeen Plastic Solution2019PO / Contract: 5500028282Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1064
Taldeen Plastic Solution2019PO / Contract: 5500028359Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1063
Taldeen Plastic Solution2019PO / Contract: 5500028371Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1062
Taldeen Plastic Solution2019PO / Contract: 5500028372Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1061
Taldeen Plastic Solution2019PO / Contract: 5500028387Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1060
Taldeen Plastic Solution2019PO / Contract: 5500028468Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1059
Taldeen Plastic Solution2019PO / Contract: 5500028547Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1058
Taldeen Plastic Solution2019PO / Contract: 5500028654Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1057
Taldeen Plastic Solution2019PO / Contract: 5500028656Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1056
Taldeen Plastic Solution2019PO / Contract: 5500028686Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1055
Taldeen Plastic Solution2019PO / Contract: 5500028696Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1054
Taldeen Plastic Solution2019PO / Contract: 5500028725Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1053
Taldeen Plastic Solution2019PO / Contract: 5500028772Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1052
Taldeen Plastic Solution2019PO / Contract: 5500028896Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1051
Taldeen Plastic Solution2019PO / Contract: 5500028908Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1050
Taldeen Plastic Solution2019PO / Contract: 5500028911Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1049
Taldeen Plastic Solution2019PO / Contract: 5500028957Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1048
Taldeen Plastic Solution2019PO / Contract: 5500028968Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1047
Taldeen Plastic Solution2019PO / Contract: 5500028973Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1046
Taldeen Plastic Solution2019PO / Contract: 5500029011Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1045
Taldeen Plastic Solution2019PO / Contract: 5500029177Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1044
Taldeen Plastic Solution2019PO / Contract: 5500029244Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1043
Taldeen Plastic Solution2019PO / Contract: 5500029248Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1042
Taldeen Plastic Solution2019PO / Contract: 5500029284Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1041
Taldeen Plastic Solution2019PO / Contract: 5500029285Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1040
Taldeen Plastic Solution2019PO / Contract: 5500029408Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1039
Taldeen Plastic Solution2019PO / Contract: 5500029500Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1038
Taldeen Plastic Solution2019PO / Contract: 5500029503Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1037
Taldeen Plastic Solution2019PO / Contract: 5500029559Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1036
Taldeen Plastic Solution2019PO / Contract: 5500029561Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1035
Taldeen Plastic Solution2019PO / Contract: 5500029573Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1034
Taldeen Plastic Solution2019PO / Contract: 5500029574Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1033
Taldeen Plastic Solution2019PO / Contract: 5500029632Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1032
Taldeen Plastic Solution2019PO / Contract: 5500029679Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1031
Taldeen Plastic Solution2019PO / Contract: 5500029736Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1030
Taldeen Plastic Solution2019PO / Contract: 5500029737Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1029
Taldeen Plastic Solution2019PO / Contract: 5500029748Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1028
Taldeen Plastic Solution2019PO / Contract: 5500029855Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1027
Taldeen Plastic Solution2019PO / Contract: 5500029870Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1026
Taldeen Plastic Solution2019PO / Contract: 5500029898Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1025
Taldeen Plastic Solution2019PO / Contract: 5500029924Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1024
Taldeen Plastic Solution2019PO / Contract: 5500029953Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1023
Taldeen Plastic Solution2019PO / Contract: 5500030024Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1022
Taldeen Plastic Solution2019PO / Contract: 5500030038Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1021
Taldeen Plastic Solution2019PO / Contract: 5500030078Completed

Under Three-Year Long-Term ARC Contract at SAAC

1020
Taldeen Plastic Solution2019PO / Contract: 5500030132Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1019
Taldeen Plastic Solution2019PO / Contract: 5500030217Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1018
Taldeen Plastic Solution2019PO / Contract: 5500030245Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1017
Taldeen Plastic Solution2019PO / Contract: 5500030281Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1016
Taldeen Plastic Solution2019PO / Contract: 4500086269Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

1015
Taldeen Plastic Solution2019PO / Contract: 5500030302Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1014
Taldeen Plastic Solution2019PO / Contract: 5500030669Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1013
Taldeen Plastic Solution2019PO / Contract: 5500030671Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1012
Taldeen Plastic Solution2019PO / Contract: 5500030812Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1011
Taldeen Plastic Solution2019PO / Contract: 5500030814Completed

Under Three-Year Long-Term ARC Contract at SAPCO

1010
Taldeen Plastic Solution2019PO / Contract: 5500030825Completed

Under Three-Year Long-Term ARC Contract at SABUCO

1009
Taldeen Plastic Solution2019PO / Contract: 5500030861Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1008
Taldeen Plastic Solution2019PO / Contract: 5500030877Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1007
Taldeen Plastic Solution2019PO / Contract: 4500086875Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

1006
Taldeen Plastic Solution2019PO / Contract: 5500031049Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1005
Taldeen Plastic Solution2019PO / Contract: 5500031139Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

1004
Taldeen Plastic Solution2019PO / Contract: 5500031183Completed

Under Three-Year Long-Term ARC Contract at SAMCO

1003
Taldeen Plastic Solution2019PO / Contract: 5500031187Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1002
Taldeen Plastic Solution2019PO / Contract: 5500031203Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1001
Taldeen Plastic Solution2019PO / Contract: 5500031206Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

1000
Taldeen Plastic Solution2019PO / Contract: 5500031218Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0999
Taldeen Plastic Solution2019PO / Contract: 4500087462Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

0998
Taldeen Plastic Solution2019PO / Contract: 5500031301Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0997
Taldeen Plastic Solution2019PO / Contract: 5500031302Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0996
Taldeen Plastic Solution2019PO / Contract: 5500031404Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0995
Taldeen Plastic Solution2019PO / Contract: 5500031453Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0994
Taldeen Plastic Solution2019PO / Contract: 5500031456Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0993
Taldeen Plastic Solution2019PO / Contract: 5500031462Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0992
Taldeen Plastic Solution2019PO / Contract: 5500031477Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0991
Taldeen Plastic Solution2019PO / Contract: 5500031497Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0990
Taldeen Plastic Solution2019PO / Contract: 5500031538Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0989
Taldeen Plastic Solution2019PO / Contract: 5500031551Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0988
Taldeen Plastic Solution2019PO / Contract: 5500031570Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0987
Taldeen Plastic Solution2019PO / Contract: 5500031608Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0986
Taldeen Plastic Solution2019PO / Contract: 5500031609Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0985
Taldeen Plastic Solution2019PO / Contract: 5500031610Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0984
Taldeen Plastic Solution2019PO / Contract: 4500088158Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0983
Taldeen Plastic Solution2019PO / Contract: 4500088245Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0982
Taldeen Plastic Solution2019PO / Contract: 5500031752Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0981
Taldeen Plastic Solution2019PO / Contract: 5500031836Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0980
Taldeen Plastic Solution2019PO / Contract: 5500031920Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0979
Taldeen Plastic Solution2019PO / Contract: 5500031968Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0978
Taldeen Plastic Solution2019PO / Contract: 5500031974Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0977
Taldeen Plastic Solution2019PO / Contract: 5500031975Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0976
Taldeen Plastic Solution2019PO / Contract: 5500032005Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0975
Taldeen Plastic Solution2019PO / Contract: 5500032081Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0974
Taldeen Plastic Solution2019PO / Contract: 5500032083Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0973
Taldeen Plastic Solution2019PO / Contract: 5500032090Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0972
Taldeen Plastic Solution2019PO / Contract: 5500032103Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0971
Taldeen Plastic Solution2019PO / Contract: 5500032287Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0970
Taldeen Plastic Solution2019PO / Contract: 5500032382Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0969
Taldeen Plastic Solution2019PO / Contract: 5500032467Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0968
Taldeen Plastic Solution2019PO / Contract: 5500032468Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0967
Taldeen Plastic Solution2019PO / Contract: 5500032472Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0966
Taldeen Plastic Solution2019PO / Contract: 4500089609Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0965
Taldeen Plastic Solution2019PO / Contract: 4500089610Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0964
Taldeen Plastic Solution2019PO / Contract: 5500032583Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0963
Taldeen Plastic Solution2019PO / Contract: 5500032622Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0962
Taldeen Plastic Solution2019PO / Contract: 4500089714Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0961
Taldeen Plastic Solution2019PO / Contract: 4500089719Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0960
Taldeen Plastic Solution2019PO / Contract: 5500032649Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0959
Taldeen Plastic Solution2019PO / Contract: 5500032659Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0958
Taldeen Plastic Solution2019PO / Contract: 4500089808Completed

Under Three-Year Long-Term ARC Contract at Technical Tetravalent Lead

0957
Taldeen Plastic Solution2019PO / Contract: 5500032771Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0956
Taldeen Plastic Solution2019PO / Contract: 5500032786Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0955
Taldeen Plastic Solution2019PO / Contract: 4500089977Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0954
Taldeen Plastic Solution2019PO / Contract: 5500032821Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0953
Taldeen Plastic Solution2019PO / Contract: 5500032838Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0952
Taldeen Plastic Solution2019PO / Contract: 5500032862Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0951
Taldeen Plastic Solution2019PO / Contract: 5500032869Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0950
Taldeen Plastic Solution2019PO / Contract: 4500090065Completed

Under Three-Year Long-Term ARC Contract at RIG Plant

0949
Taldeen Plastic Solution2019PO / Contract: 5500032931Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0948
Taldeen Plastic Solution2019PO / Contract: 5500032932Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0947
Taldeen Plastic Solution2019PO / Contract: 5500032954Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0946
Taldeen Plastic Solution2019PO / Contract: 4500090130Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0945
Taldeen Plastic Solution2019PO / Contract: 5500033076Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0944
Taldeen Plastic Solution2019PO / Contract: 5500033079Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0943
Taldeen Plastic Solution2019PO / Contract: 4500090218Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0942
Taldeen Plastic Solution2019PO / Contract: 4500090246Completed

Under Three-Year Long-Term ARC Contract at Pipes Plant - Hail

0941
Taldeen Plastic Solution2019PO / Contract: 5500033122Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0940
Taldeen Plastic Solution2019PO / Contract: 5500033123Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0939
Taldeen Plastic Solution2019PO / Contract: 5500033134Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0938
Taldeen Plastic Solution2019PO / Contract: 5500033135Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0937
Taldeen Plastic Solution2019PO / Contract: 4500090368Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0936
Taldeen Plastic Solution2019PO / Contract: 5500033230Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0935
Taldeen Plastic Solution2019PO / Contract: 5500033308Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0934
Taldeen Plastic Solution2019PO / Contract: 4500090472Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0933
Taldeen Plastic Solution2019PO / Contract: 4500090525Completed

Under Three-Year Long-Term ARC Contract at RIG Plant

0932
Taldeen Plastic Solution2019PO / Contract: 5500033366Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0931
Taldeen Plastic Solution2019PO / Contract: 5500033395Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0930
Taldeen Plastic Solution2019PO / Contract: 5500033480Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0929
Taldeen Plastic Solution2019PO / Contract: 5500033552Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0928
Taldeen Plastic Solution2019PO / Contract: 5500033779Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0927
Taldeen Plastic Solution2019PO / Contract: 5500033783Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0926
Taldeen Plastic Solution2019PO / Contract: 5500033810Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0925
Taldeen Plastic Solution2019PO / Contract: 5500033812Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0924
Taldeen Plastic Solution2019PO / Contract: 5500033830Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0923
Taldeen Plastic Solution2019PO / Contract: 5500033840Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0922
Taldeen Plastic Solution2019PO / Contract: 5500033843Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0921
Taldeen Plastic Solution2019PO / Contract: 5500033844Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0920
Taldeen Plastic Solution2019PO / Contract: 5500033857Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0919
Taldeen Plastic Solution2019PO / Contract: 5500033858Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0918
Taldeen Plastic Solution2019PO / Contract: 5500033859Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0917
Taldeen Plastic Solution2019PO / Contract: 5500033860Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0916
Taldeen Plastic Solution2019PO / Contract: 5500033863Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0915
Taldeen Plastic Solution2019PO / Contract: 5500033864Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0914
Taldeen Plastic Solution2019PO / Contract: 5500033865Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0913
Taldeen Plastic Solution2019PO / Contract: 5500033879Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0912
Taldeen Plastic Solution2019PO / Contract: 5500033880Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0911
Taldeen Plastic Solution2019PO / Contract: 4500091204Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0910
Taldeen Plastic Solution2019PO / Contract: 4500091207Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0909
Taldeen Plastic Solution2019PO / Contract: 5500033958Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0908
Taldeen Plastic Solution2019PO / Contract: 4500091400Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0907
Taldeen Plastic Solution2019PO / Contract: 4500091406Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0906
Taldeen Plastic Solution2019PO / Contract: 4500091427Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0905
Taldeen Plastic Solution2019PO / Contract: 4500091481Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0904
Taldeen Plastic Solution2019PO / Contract: 4500091489Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0903
Taldeen Plastic Solution2019PO / Contract: 4500091492Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0902
Taldeen Plastic Solution2019PO / Contract: 4500091498Completed

Under Three-Year Long-Term ARC Contract at RGP- BOPP Plant

0901
Taldeen Plastic Solution2019PO / Contract: 4500091674Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0900
Taldeen Plastic Solution2019PO / Contract: 5500034162Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0899
Taldeen Plastic Solution2019PO / Contract: 5500034238Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0898
Taldeen Plastic Solution2019PO / Contract: 5500034338Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0897
Taldeen Plastic Solution2019PO / Contract: 5500034339Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0896
Taldeen Plastic Solution2019PO / Contract: 5500034340Completed

Under Three-Year Long-Term ARC Contract at SAAC

0895
Taldeen Plastic Solution2019PO / Contract: 5500034342Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0894
Taldeen Plastic Solution2019PO / Contract: 5500034343Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0893
Taldeen Plastic Solution2019PO / Contract: 5500034345Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0892
Taldeen Plastic Solution2019PO / Contract: 4500091912Completed

Under Three-Year Long-Term ARC Contract at RGP- BOPP Plant

0891
Taldeen Plastic Solution2019PO / Contract: 5500034437Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0890
Taldeen Plastic Solution2019PO / Contract: 4500092159Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0889
Taldeen Plastic Solution2019PO / Contract: 5500034564Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0888
Taldeen Plastic Solution2019PO / Contract: 5500034635Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0887
Taldeen Plastic Solution2019PO / Contract: 5500034743Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0886
Taldeen Plastic Solution2019PO / Contract: 5500034764Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0885
Taldeen Plastic Solution2019PO / Contract: 4500092330Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0884
Taldeen Plastic Solution2019PO / Contract: 4500092340Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0883
Taldeen Plastic Solution2019PO / Contract: 4500092348Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0882
Taldeen Plastic Solution2019PO / Contract: 5500035243Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0881
Taldeen Plastic Solution2019PO / Contract: 4500092863Completed

Under Three-Year Long-Term ARC Contract at RGP- BOPP Plant

0880
Taldeen Plastic Solution2019PO / Contract: 4500092921Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0879
Taldeen Plastic Solution2019PO / Contract: 5500035325Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0878
Taldeen Plastic Solution2019PO / Contract: 5500035352Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0877
Taldeen Plastic Solution2019PO / Contract: 5500035361Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0876
Taldeen Plastic Solution2019PO / Contract: 4500093112Completed

Under Three-Year Long-Term ARC Contract at Pipes Plant - Hail

0875
Taldeen Plastic Solution2019PO / Contract: 5500035483Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0874
Taldeen Plastic Solution2019PO / Contract: 5500035580Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0873
Taldeen Plastic Solution2019PO / Contract: 5500035586Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0872
Taldeen Plastic Solution2019PO / Contract: 5500035612Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0871
Taldeen Plastic Solution2019PO / Contract: 5500035613Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0870
Taldeen Plastic Solution2019PO / Contract: 5500035614Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0869
Taldeen Plastic Solution2019PO / Contract: 5500035629Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0868
Taldeen Plastic Solution2019PO / Contract: 5500035747Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0867
Taldeen Plastic Solution2019PO / Contract: 5500035760Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0866
Taldeen Plastic Solution2019PO / Contract: 5500035767Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0865
Taldeen Plastic Solution2019PO / Contract: 5500035769Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0864
Taldeen Plastic Solution2019PO / Contract: 5500035775Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0863
Taldeen Plastic Solution2019PO / Contract: 5500035776Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0862
Taldeen Plastic Solution2019PO / Contract: 5500035777Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0861
Taldeen Plastic Solution2019PO / Contract: 5500035779Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0860
Taldeen Plastic Solution2019PO / Contract: 5500035782Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0859
Taldeen Plastic Solution2019PO / Contract: 5500035783Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0858
Taldeen Plastic Solution2019PO / Contract: 5500035829Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0857
Taldeen Plastic Solution2019PO / Contract: 4500093673Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0856
Taldeen Plastic Solution2019PO / Contract: 5500036043Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0855
Taldeen Plastic Solution2019PO / Contract: 5500036060Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0854
Taldeen Plastic Solution2019PO / Contract: 4500093826Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0853
Taldeen Plastic Solution2019PO / Contract: 5500036208Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0852
Taldeen Plastic Solution2019PO / Contract: 5500036210Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0851
Taldeen Plastic Solution2019PO / Contract: 5500036228Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0850
Taldeen Plastic Solution2019PO / Contract: 5500036260Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0849
Taldeen Plastic Solution2019PO / Contract: 5500036306Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0848
Taldeen Plastic Solution2019PO / Contract: 5500036366Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0847
Taldeen Plastic Solution2019PO / Contract: 5500036466Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0846
Taldeen Plastic Solution2019PO / Contract: 5500036481Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0845
Taldeen Plastic Solution2019PO / Contract: 4500094190Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0844
Taldeen Plastic Solution2019PO / Contract: 5500036509Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0843
Taldeen Plastic Solution2019PO / Contract: 5500036510Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0842
Taldeen Plastic Solution2019PO / Contract: 5500036557Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0841
Taldeen Plastic Solution2019PO / Contract: 5500036559Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0840
Taldeen Plastic Solution2019PO / Contract: 5500036560Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0839
Taldeen Plastic Solution2019PO / Contract: 4500094343Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0838
Taldeen Plastic Solution2019PO / Contract: 5500036627Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0837
Taldeen Plastic Solution2019PO / Contract: 5500036629Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0836
Taldeen Plastic Solution2019PO / Contract: 5500036635Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0835
Taldeen Plastic Solution2019PO / Contract: 5500036658Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0834
Taldeen Plastic Solution2019PO / Contract: 5500036662Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0833
Taldeen Plastic Solution2019PO / Contract: 5500036681Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0832
Taldeen Plastic Solution2019PO / Contract: 5500036784Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0831
Taldeen Plastic Solution2019PO / Contract: 5500036835Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0830
Taldeen Plastic Solution2019PO / Contract: 4500094558Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0829
Taldeen Plastic Solution2019PO / Contract: 5500036847Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0828
Taldeen Plastic Solution2019PO / Contract: 5500036848Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0827
Taldeen Plastic Solution2019PO / Contract: 5500036852Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0826
Taldeen Plastic Solution2019PO / Contract: 5500036971Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0825
Taldeen Plastic Solution2019PO / Contract: 5500036994Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0824
Taldeen Plastic Solution2019PO / Contract: 5500036995Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0823
Taldeen Plastic Solution2019PO / Contract: 5500037011Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0822
Taldeen Plastic Solution2019PO / Contract: 5500037045Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0821
Taldeen Plastic Solution2019PO / Contract: 5500037058Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0820
Taldeen Plastic Solution2019PO / Contract: 5500037175Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0819
Taldeen Plastic Solution2019PO / Contract: 5500037232Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0818
Taldeen Plastic Solution2019PO / Contract: 5500037263Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0817
Taldeen Plastic Solution2019PO / Contract: 4800014171Completed

Under Three-Year Long-Term ARC Contract at SAAC

0816
Taldeen Plastic Solution2019PO / Contract: 5500037276Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0815
Taldeen Plastic Solution2019PO / Contract: 5500037305Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0814
Taldeen Plastic Solution2019PO / Contract: 4500095114Completed

Under Three-Year Long-Term ARC Contract at Pipes Plant - Hail

0813
Taldeen Plastic Solution2019PO / Contract: 4500095158Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0812
Taldeen Plastic Solution2019PO / Contract: 5500037380Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0811
Taldeen Plastic Solution2019PO / Contract: 4500095353Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0810
Taldeen Plastic Solution2019PO / Contract: 5500037539Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0809
Taldeen Plastic Solution2019PO / Contract: 5500037567Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0808
Taldeen Plastic Solution2019PO / Contract: 5500037584Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0807
Taldeen Plastic Solution2019PO / Contract: 5500037645Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0806
Taldeen Plastic Solution2019PO / Contract: 5500037694Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0805
Taldeen Plastic Solution2019PO / Contract: 5500037703Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0804
Taldeen Plastic Solution2019PO / Contract: 4500095576Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0803
Taldeen Plastic Solution2019PO / Contract: 4500095586Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0802
Taldeen Plastic Solution2019PO / Contract: 4500095588Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0801
Taldeen Plastic Solution2019PO / Contract: 5500037763Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0800
Taldeen Plastic Solution2019PO / Contract: 5500037764Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0799
Taldeen Plastic Solution2019PO / Contract: 5500037766Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0798
Taldeen Plastic Solution2019PO / Contract: 4500095738Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0797
Taldeen Plastic Solution2019PO / Contract: 5500037874Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0796
Taldeen Plastic Solution2019PO / Contract: 5500037877Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0795
Taldeen Plastic Solution2019PO / Contract: 5500037972Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0794
Taldeen Plastic Solution2019PO / Contract: 4500095871Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0793
Taldeen Plastic Solution2019PO / Contract: 5500038055Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0792
Taldeen Plastic Solution2019PO / Contract: 5500038068Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0791
Taldeen Plastic Solution2019PO / Contract: 5500038078Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0790
Taldeen Plastic Solution2019PO / Contract: 5500038102Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0789
Taldeen Plastic Solution2019PO / Contract: 5500038122Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0788
Taldeen Plastic Solution2019PO / Contract: 5500038135Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0787
Taldeen Plastic Solution2019PO / Contract: 5500038136Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0786
Taldeen Plastic Solution2019PO / Contract: 5500038168Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0785
Taldeen Plastic Solution2019PO / Contract: 5500038227Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0784
Taldeen Plastic Solution2019PO / Contract: 5500038307Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0783
Taldeen Plastic Solution2019PO / Contract: 5500038402Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0782
Taldeen Plastic Solution2019PO / Contract: 5500038421Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0781
Taldeen Plastic Solution2019PO / Contract: 4500096604Completed

Under Three-Year Long-Term ARC Contract at National Lead Smelting Company

0780
Taldeen Plastic Solution2019PO / Contract: 5500038610Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0779
Taldeen Plastic Solution2019PO / Contract: 5500038724Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0778
Taldeen Plastic Solution2019PO / Contract: 5500038749Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0777
Taldeen Plastic Solution2019PO / Contract: 5500038764Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0776
Taldeen Plastic Solution2019PO / Contract: 5500038767Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0775
Taldeen Plastic Solution2019PO / Contract: 5500038781Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0774
Taldeen Plastic Solution2019PO / Contract: 5500038832Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0773
Taldeen Plastic Solution2019PO / Contract: 5500038844Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0772
Taldeen Plastic Solution2019PO / Contract: 4500096987Completed

Under Three-Year Long-Term ARC Contract at National Batteries Company

0771
Taldeen Plastic Solution2019PO / Contract: 5500038953Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0770
Taldeen Plastic Solution2019PO / Contract: 5500038955Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0769
Taldeen Plastic Solution2019PO / Contract: 5500038957Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0768
Taldeen Plastic Solution2019PO / Contract: 5500038977Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0767
Taldeen Plastic Solution2019PO / Contract: 5500038995Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0766
Taldeen Plastic Solution2019PO / Contract: 5500039078Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0765
Taldeen Plastic Solution2019PO / Contract: 5500039116Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0764
Taldeen Plastic Solution2019PO / Contract: 5500039122Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0763
Taldeen Plastic Solution2019PO / Contract: 5500039125Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0762
Taldeen Plastic Solution2019PO / Contract: 5500039126Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0761
Taldeen Plastic Solution2019PO / Contract: 5500039127Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0760
Taldeen Plastic Solution2019PO / Contract: 5500039129Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0759
Taldeen Plastic Solution2019PO / Contract: 5500039130Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0758
Taldeen Plastic Solution2019PO / Contract: 5500039134Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0757
Taldeen Plastic Solution2019PO / Contract: 5500039135Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0756
Taldeen Plastic Solution2019PO / Contract: 5500039269Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0755
Taldeen Plastic Solution2019PO / Contract: 5500039270Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0754
Taldeen Plastic Solution2019PO / Contract: 5500039271Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0753
Taldeen Plastic Solution2019PO / Contract: 5500039272Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0752
Taldeen Plastic Solution2019PO / Contract: 5500039321Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0751
Taldeen Plastic Solution2019PO / Contract: 5500039338Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0750
Taldeen Plastic Solution2019PO / Contract: 5500039340Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0749
Taldeen Plastic Solution2019PO / Contract: 5500039341Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0748
Taldeen Plastic Solution2019PO / Contract: 5500039418Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0747
Taldeen Plastic Solution2019PO / Contract: 5500039421Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0746
Taldeen Plastic Solution2019PO / Contract: 5500039422Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0745
Taldeen Plastic Solution2019PO / Contract: 5500039470Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0744
Taldeen Plastic Solution2019PO / Contract: 5500039423Completed

MCC modification design for additional plant electrical loads.

0743
Taldeen Plastic Solution2019PO / Contract: 5500039273Completed

Cable sizing, routing and preparation of electrical cable schedules.

0742
Taldeen Plastic Solution2019PO / Contract: 5500039133Completed

PLC and control-panel design for automated pumping and utility systems.

0741
Taldeen Plastic Solution2019PO / Contract: 5500039079Completed

Cooling-tower condition assessment and preparation of repair recommendations.

0740
Taldeen Plastic Solution2019PO / Contract: 5500038915Completed

Modification and extension of existing motor control centres.

0739
Taldeen Plastic Solution2019PO / Contract: 5500038611Completed

Instrumentation design for pressure, temperature, flow and level measurement.

0738
Taldeen Plastic Solution2019PO / Contract: 5500038167Completed

Multidisciplinary engineering support for TASNEE plant modifications.

0737
Taldeen Plastic Solution2019PO / Contract: 5500038049Completed

Removal and reinstatement of piping insulation and aluminium cladding.

0736
Taldeen Plastic Solution2019PO / Contract: 5500037765Completed

Earth-resistance testing and rectification of defective grounding systems.

0735
Taldeen Plastic Solution2019PO / Contract: 5500037660Completed

DCS modification design for process-unit expansion and equipment integration.

0734
Taldeen Plastic Solution2019PO / Contract: 5500037341Completed

Construction of foundations for new process and utility equipment.

0733
Taldeen Plastic Solution2019PO / Contract: 5500037137Completed

Shutdown inspection, repair, protective coating and reinstatement of critical piping-support systems.

0732
Taldeen Plastic Solution2019PO / Contract: 5500036850Completed

Installation and modification of local control panels and junction boxes.

0731
Taldeen Plastic Solution2019PO / Contract: 5500036661Completed

Installation of equipment-support steel structures.

0730
Taldeen Plastic Solution2019PO / Contract: 5500036558Completed

Installation and testing of plant grounding and bonding connections.

0729
Taldeen Plastic Solution2019PO / Contract: 41005348Completed

Loop checking and functional testing of field instrumentation.

0728
Taldeen Plastic Solution2019PO / Contract: 4500093755Completed

Repair and replacement of corroded gratings, stair treads and handrails.

0727
Taldeen Plastic Solution2019PO / Contract: 5500035778Completed

Detailed electrical design for additional process and utility equipment.

0726
Taldeen Plastic Solution2019PO / Contract: 4500093390Completed

Replacement of pump bearings, seals, couplings and damaged components.

0725
Taldeen Plastic Solution2019PO / Contract: 4500093113Completed

Design of permanent pipe supports, anchors, guides and spring hangers.

0724
Taldeen Plastic Solution2019PO / Contract: 4500092731Completed

Integration of field instruments with existing PLC and DCS systems.

0723
Taldeen Plastic Solution2019PO / Contract: 5500034544Completed

Replacement of cooling-tower distribution piping and isolation valves.

0722
Taldeen Plastic Solution2019PO / Contract: 5500034341Completed

Magnetic-particle and dye-penetrant testing of mechanical components.

0721
Taldeen Plastic Solution2019PO / Contract: 4500091495Completed

Modification of pipe racks to accommodate additional process lines.

0720
Taldeen Plastic Solution2019PO / Contract: 4500091238Completed

Control-valve sizing and selection for process and utility applications.

0719
Taldeen Plastic Solution2019PO / Contract: 5500033862Completed

Grouting and foundation repair for pumps, motors and rotating equipment.

0718
Taldeen Plastic Solution2019PO / Contract: 5500033836Completed

Installation and maintenance of lightning-protection systems.

0717
Taldeen Plastic Solution2019PO / Contract: 5500033437Completed

Repair of leaking flange joints and replacement of damaged gaskets.

0716
Taldeen Plastic Solution2019PO / Contract: 4500090381Completed

Preventive maintenance of fire-and-gas detection systems.

0715
Taldeen Plastic Solution2019PO / Contract: 5500033082Completed

Process design for industrial wastewater treatment and reuse systems.

0714
Taldeen Plastic Solution2019PO / Contract: 4500090063Completed

Hydrotesting and leak testing of repaired heat exchangers.

0713
Taldeen Plastic Solution2019PO / Contract: 5500032769Completed

Inspection and load verification of constant spring supports and spring hangers.

0712
Taldeen Plastic Solution2019PO / Contract: 4500089611Completed

Maintenance of UPS systems, battery banks and emergency power supplies.

0711
Taldeen Plastic Solution2019PO / Contract: 5500032245Completed

Installation of stainless-steel piping for chemical and utility services.

0710
Taldeen Plastic Solution2019PO / Contract: 5500031971Completed

Calibration and verification of tank-level measurement instruments.

0709
Taldeen Plastic Solution2019PO / Contract: 5500031614Completed

Positive material identification of alloy piping, valves and equipment.

0708
Taldeen Plastic Solution2019PO / Contract: 5500031486Completed

Repair of concrete columns, beams, slabs and industrial structures.

0707
Taldeen Plastic Solution2019PO / Contract: 5500031289Completed

Piping rerouting design for process-unit modifications and capacity expansion.

0706
Taldeen Plastic Solution2019PO / Contract: 5500031127Completed

Mechanical, electrical and instrumentation maintenance during scheduled shutdowns.

0705
Taldeen Plastic Solution2019PO / Contract: 5500030803Completed

Replacement of corroded pipe shoes, clamps, U-bolts, guides, anchors and structural attachments.

0704
Taldeen Plastic Solution2019PO / Contract: 5500030213Completed

Installation of cable trays, conduits and underground cable routes.

0703
Taldeen Plastic Solution2019PO / Contract: 5500029906Completed

Mechanical cleaning and descaling of heat-transfer equipment.

0702
Taldeen Plastic Solution2019PO / Contract: 5500029670Completed

Calibration and functional testing of switches, gauges and transmitters.

0701
Taldeen Plastic Solution2019PO / Contract: 5500029456Completed

Structural assessment and strengthening of existing industrial platforms.

0700
Taldeen Plastic Solution2019PO / Contract: 5500028974Completed

Repair and refurbishment of valve actuators and positioners.

0699
Taldeen Plastic Solution2019PO / Contract: 5500028727Completed

Pipe-to-soil potential surveys and current-interruption testing of cathodically protected pipelines.

0698
Taldeen Plastic Solution2019PO / Contract: 5500028419Completed

Inspection and overhaul of industrial compressors and auxiliary systems.

0697
Taldeen Plastic Solution2019PO / Contract: 5500028109Completed

Grounding and lightning-protection design for TASNEE substations.

0696
Taldeen Plastic Solution2019PO / Contract: 5500028053Completed

Installation of prefabricated piping spools, fittings, flanges and valves.

0695
Taldeen Plastic Solution2019PO / Contract: 5500027863Completed

Repair and sealing of underground concrete pits and water-retaining structures.

0694
Taldeen Plastic Solution2019PO / Contract: 5500072885Completed

Outside plant (OSP) trenching, ducting, and cable laying, providing secure underground and overhead network connections for long-distance data transmission.

0693
RIG (Rowad International Geosynthetics Company)2019PO / Contract: 5500072135Completed

Integration of IP surveillance systems, enabling real-time video monitoring and remote access for enhanced security.

0692
Taldeen Plastic Solution2019PO / Contract: 5500072998Completed

Access control and door monitoring systems installation, enhancing facility security by regulating entry and tracking personnel movement.

0691
Rowad Global Packaging Company2019PO / Contract: 5500072322Completed

Design, deployment, and testing of satellite communication systems, supporting remote locations and ensuring constant connectivity in isolated environments.

0690
Rowad Global Packaging Company2019PO / Contract: 5500072567Completed

Integration of telecom and IT systems with BMS and smart building platforms, enabling centralized control and automation.

0689
NBC (National Batteries Company)2019PO / Contract: 5500071953Completed

Fiber optic backbone infrastructure design, splicing, and testing, supporting long-distance high-bandwidth transmission.

0688
Rowad Global Packaging Company2019PO / Contract: 5500071246Completed

Structured cabling system installation for LAN/WAN/Wi-Fi networks, ensuring seamless connectivity and organized infrastructure.

0687
Rowad Global Packaging Company2019PO / Contract: 5500070789Completed

Servicing of plumbing pumps and control panels, ensuring reliable water supply and drainage.

0686
Technical Tetravalent Lead Smelting Plant2019PO / Contract: 5500071684Completed

Periodic testing of ELCBs and MCCBs, confirming reliable electrical protection in distribution systems.

0685
Technical Tetravalent Lead Smelting Plant2019PO / Contract: 5500071745Completed

Installation and maintenance of structured cabling systems for LAN/WAN and Wi-Fi networks, ensuring reliable connectivity across facilities.

0684
RIG (Rowad International Geosynthetics Company)2019PO / Contract: 5500070987Completed

Security system operation and CCTV monitoring, maintaining facility safety through surveillance and access control.

0683
National Lead Smelting Company2019PO / Contract: 5500070654Completed

Cleaning and servicing of switchgear compartments, improving lifespan and safe operation of electrical equipment.

0682
Rassas2019PO / Contract: 5500070852Completed

CMMS-based maintenance support using Computerized Maintenance Management System for planned and corrective actions.

0681
Rowad Global Packaging Company2019PO / Contract: 5500069963Completed

Plumbing and drainage system maintenance, ensuring uninterrupted flow and preventing blockages in facility pipelines.

0680
Saudi Polyolefin Company2019PO / Contract: 5500069666Completed

Electrical LV/MV switchgear servicing, supporting reliable power distribution and system protection.

0679
SEPC (Saudi Ethylene and Polyethylene Company)2019PO / Contract: 5500069523Completed

RTR joint inspection and holiday testing, ensuring joint integrity and identifying coating defects before commissioning.

0678
Saudi Butanol Company2019PO / Contract: 5500069950Completed

Fire suppression system inspection and testing, ensuring compliance with safety regulations during routine maintenance or shutdowns.

0677
Saudi Polyolefin Company2019PO / Contract: 5500069459Completed

BMS sensor calibration and commissioning, ensuring accurate data input and optimized system operation during startup or shutdowns.

0676
Saudi Acrylic Monomer Company2019PO / Contract: 5500069874Completed

Fire alarm system installation, commissioning, and testing, ensuring full operational readiness during plant shutdowns and turnarounds.

0675
Saudi Butanol Company2019PO / Contract: 5500070456Completed

Minor equipment modifications and upgrades, improving efficiency, safety, and compliance during plant turnarounds.

0674
Saudi Acrylic Monomer Company2019PO / Contract: 5500070421Completed

Junction box installation and wiring, providing easy access for maintenance, troubleshooting, and upgrades during shutdowns and turnarounds.

0673
Saudi Polyolefin Company2019PO / Contract: 5500070283Completed

Concrete repair and epoxy injection works for concrete repairs using epoxy injection to restore structural integrity.

0672
Saudi Acrylic Monomer Company2019PO / Contract: 5500069746Completed

Asphalt road and pavement repair through repair and resurfacing of asphalt roads and pavements.

0671
Saudi Acrylic Monomer Company2019PO / Contract: 5500070181Completed

Tank fabrication, shell repair, and internal modifications.

0670
Saudi Acrylic Acid Company2019PO / Contract: 5500069646Completed

Pipeline welding, NDT, and QA/QC documentation.

0669
Gulf Packaging2019PO / Contract: PO-194799Completed

Site Development of Trio Mada & GPIl

0668
Ma’aden2019PO / Contract: GACC-042-247Completed

Fabrication Drawings of Steel Structure- Maaden Phosphate

NSH(Nasser S. Al Hajri Corporation)

0667
EAST GAS2019PO / Contract: TPE/016/2019Completed

Extension of NG pipeline to two new customers (CID #62 and CID#63) and new tapping to existing customer (CID #50)

0666
Petrorabigh2019PO / Contract: Harycon-PO-EDS-001.019Completed

Civil & Structural Scope For New Floating Pontoon For Coastal Guard, Petro Rabigh

Harycon

0665
TASNEE2019PO / Contract: 4800016171Completed

As Built for BAP Project , SabTank, tank terminal operator

0664
EAST GAS2019PO / Contract: EGCL/169/2019Completed

Primary Metering Station Validation

0663
EAST GAS2019PO / Contract: EGCL/114/2019Completed

Revision Of AS-BUILT System 2019

0662
TASNEE2019PO / Contract: 5500011399Completed

Turnaround Manpower services in PP Plant

0661
TASNEE2019PO / Contract: 5500026270Completed

Turnaround Manpower services in PDH Plant

0660
TASNEE2019PO / Contract: 5500023662Completed

PMC Services

0659
TASNEE2019PO / Contract: 5500018724Completed

PMC Services

0658
TASNEE2019PO / Contract: 5500024580Completed

PMC Services

0657
TASNEE Downstream2019PO / Contract: 9000000418Completed

Long Term Contract- ARC Contract (3 Years)

0656
TASNEE2019PO / Contract: CW7748Completed

Long Term Contract- ARC Contract (3 Years)

0655
Rassas2018PO / Contract: 5500017478Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0654
Rassas2018PO / Contract: 5500017488Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0653
Rassas2018PO / Contract: 5500017509Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0652
Rassas2018PO / Contract: 5500017557Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0651
Rassas2018PO / Contract: 5500017562Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0650
Rassas2018PO / Contract: 5500017565Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0649
Rassas2018PO / Contract: 5500017585Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0648
Rassas2018PO / Contract: 5500017587Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0647
Rassas2018PO / Contract: 5500017613Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0646
Rassas2018PO / Contract: 5500017646Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0645
Rassas2018PO / Contract: 5500017692Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0644
Rassas2018PO / Contract: 5500017701Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0643
Rassas2018PO / Contract: 5500017714Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0642
Rassas2018PO / Contract: 5500017741Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0641
Rassas2018PO / Contract: 5500017798Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0640
Rassas2018PO / Contract: 5500017803Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0639
Rassas2018PO / Contract: 5500017997Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0638
Rassas2018PO / Contract: 5500018007Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0637
Rassas2018PO / Contract: 5500018029Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0636
Rassas2018PO / Contract: 5500018124Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0635
Rassas2018PO / Contract: 5500018131Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0634
Rassas2018PO / Contract: 5500018187Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0633
Rassas2018PO / Contract: 5500018188Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0632
Rassas2018PO / Contract: 5500018219Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0631
Rassas2018PO / Contract: 5500018220Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0630
Rassas2018PO / Contract: 5500018242Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0629
Rassas2018PO / Contract: 5500018312Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0628
Rassas2018PO / Contract: 5500018410Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0627
Rassas2018PO / Contract: 5500018458Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0626
Rassas2018PO / Contract: 5500018565Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0625
Rassas2018PO / Contract: 5500018880Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0624
Rassas2018PO / Contract: 5500018883Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0623
Rassas2018PO / Contract: 5500018885Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0622
Rassas2018PO / Contract: 5500018896Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0621
Rassas2018PO / Contract: 5500018911Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0620
Rassas2018PO / Contract: 5500018980Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0619
Rassas2018PO / Contract: 5500018982Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0618
Rassas2018PO / Contract: 5500019026Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0617
Rassas2018PO / Contract: 5500019039Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0616
Rassas2018PO / Contract: 5500019054Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0615
Rassas2018PO / Contract: 5500019078Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0614
Rassas2018PO / Contract: 5500019177Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0613
Rassas2018PO / Contract: 5500019180Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0612
Rassas2018PO / Contract: 5500019181Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0611
Rassas2018PO / Contract: 5500019182Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0610
Rassas2018PO / Contract: 5500019183Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0609
Rassas2018PO / Contract: 5500019213Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0608
Rassas2018PO / Contract: 5500019259Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0607
Rassas2018PO / Contract: 5500019324Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0606
Rassas2018PO / Contract: 5500019366Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0605
Rassas2018PO / Contract: 5500019390Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0604
Rassas2018PO / Contract: 5500019391Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0603
Rassas2018PO / Contract: 5500019392Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0602
Rassas2018PO / Contract: 5500019393Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0601
Rassas2018PO / Contract: 5500019433Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0600
Rassas2018PO / Contract: 5500019438Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0599
Rassas2018PO / Contract: 5500019455Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0598
Rassas2018PO / Contract: 4500071622Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

0597
Rassas2018PO / Contract: 5500019481Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0596
Rassas2018PO / Contract: 5500019568Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0595
Rassas2018PO / Contract: 5500019613Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0594
Rassas2018PO / Contract: 4500071850Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0593
Rassas2018PO / Contract: 5500019715Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0592
Rassas2018PO / Contract: 5500019749Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0591
Rassas2018PO / Contract: 5500019868Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0590
Rassas2018PO / Contract: 5500019873Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0589
Rassas2018PO / Contract: 5500019884Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0588
Rassas2018PO / Contract: 5500020012Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0587
Rassas2018PO / Contract: 5500020191Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0586
Rassas2018PO / Contract: 5500020199Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0585
Rassas2018PO / Contract: 5500020221Completed

Under Three-Year Long-Term ARC Contract at SAAC

0584
Rassas2018PO / Contract: 5500020252Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0583
Rassas2018PO / Contract: 5500020299Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0582
Rassas2018PO / Contract: 5500020300Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0581
Rassas2018PO / Contract: 5500020366Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0580
Rassas2018PO / Contract: 5500020381Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0579
Rassas2018PO / Contract: 5500020435Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0578
Rassas2018PO / Contract: 5500020506Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0577
Rassas2018PO / Contract: 5500020543Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0576
Rassas2018PO / Contract: 5500020611Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0575
Rassas2018PO / Contract: 5500020702Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0574
Rassas2018PO / Contract: 4500073620Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

0573
Rassas2018PO / Contract: 5500020765Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0572
Rassas2018PO / Contract: 5500020787Completed

Under Three-Year Long-Term ARC Contract at SAAC

0571
Rassas2018PO / Contract: 5500020788Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0570
Rassas2018PO / Contract: 5500020789Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0569
Rassas2018PO / Contract: 5500020792Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0568
Rassas2018PO / Contract: 5500020793Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0567
Rassas2018PO / Contract: 5500020889Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0566
Rassas2018PO / Contract: 5500020892Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0565
Rassas2018PO / Contract: 5500020926Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0564
Rassas2018PO / Contract: 5500020927Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0563
Rassas2018PO / Contract: 5500020928Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0562
Rassas2018PO / Contract: 5500020970Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0561
Rassas2018PO / Contract: 5500020999Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0560
Rassas2018PO / Contract: 5500021027Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0559
Rassas2018PO / Contract: 5500021043Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0558
Rassas2018PO / Contract: 5500021070Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0557
Rassas2018PO / Contract: 5500021174Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0556
Rassas2018PO / Contract: 5500021178Completed

Under Three-Year Long-Term ARC Contract at SAAC

0555
Rassas2018PO / Contract: 5500021196Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0554
Rassas2018PO / Contract: 5500021224Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0553
Rassas2018PO / Contract: 5500021367Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0552
Rassas2018PO / Contract: 5500021550Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0551
Rassas2018PO / Contract: 5500021623Completed

Under Three-Year Long-Term ARC Contract at SAAC

0550
Rassas2018PO / Contract: 5500021636Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0549
Rassas2018PO / Contract: 5500021646Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0548
Rassas2018PO / Contract: 5500021675Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0547
Rassas2018PO / Contract: 5500021750Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0546
Rassas2018PO / Contract: 5500021756Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0545
Rassas2018PO / Contract: 5500021786Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0544
Rassas2018PO / Contract: 5500021787Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0543
Rassas2018PO / Contract: 5500021832Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0542
Rassas2018PO / Contract: 5500021853Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0541
Rassas2018PO / Contract: 5500021927Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0540
Rassas2018PO / Contract: 5500021930Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0539
Rassas2018PO / Contract: 5500021931Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0538
Rassas2018PO / Contract: 5500021932Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0537
Rassas2018PO / Contract: 5500021933Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0536
Rassas2018PO / Contract: 5500022049Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0535
Rassas2018PO / Contract: 5500022074Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0534
Rassas2018PO / Contract: 5500022107Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0533
Rassas2018PO / Contract: 5500022270Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0532
Rassas2018PO / Contract: 5500022295Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0531
Rassas2018PO / Contract: 5500022312Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0530
Rassas2018PO / Contract: 5500022353Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0529
Rassas2018PO / Contract: 5500022428Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0528
Rassas2018PO / Contract: 5500022431Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0527
Rassas2018PO / Contract: 5500022432Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0526
Rassas2018PO / Contract: 5500022565Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0525
Rassas2018PO / Contract: 5500022613Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0524
Rassas2018PO / Contract: 5500022623Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0523
Rassas2018PO / Contract: 5500022624Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0522
Rassas2018PO / Contract: 5500022644Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0521
Rassas2018PO / Contract: 5500022645Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0520
Rassas2018PO / Contract: 5500022646Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0519
Rassas2018PO / Contract: 5500022649Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0518
Rassas2018PO / Contract: 5500022650Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0517
Rassas2018PO / Contract: 5500022651Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0516
Rassas2018PO / Contract: 5500022652Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0515
Rassas2018PO / Contract: 5500022653Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0514
Rassas2018PO / Contract: 5500022701Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0513
Rassas2018PO / Contract: 5500022721Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0512
Rassas2018PO / Contract: 4500076720Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

0511
Rassas2018PO / Contract: 5500023022Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0510
Rassas2018PO / Contract: 5500023073Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0509
Rassas2018PO / Contract: 5500023076Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0508
Rassas2018PO / Contract: 5500023103Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0507
Rassas2018PO / Contract: 5500023114Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0506
Rassas2018PO / Contract: 5500023115Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0505
Rassas2018PO / Contract: 5500023200Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0504
Rassas2018PO / Contract: 5500023234Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0503
Rassas2018PO / Contract: 5500023235Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0502
Rassas2018PO / Contract: 5500023292Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0501
Rassas2018PO / Contract: 5500023295Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0500
Rassas2018PO / Contract: 5500023296Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0499
Rassas2018PO / Contract: 5500023322Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0498
Rassas2018PO / Contract: 5500023327Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0497
Rassas2018PO / Contract: 5500023434Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0496
Rassas2018PO / Contract: 5500023464Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0495
Rassas2018PO / Contract: 5500023543Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0494
Rassas2018PO / Contract: 5500023593Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0493
Rassas2018PO / Contract: 5500023600Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0492
Rassas2018PO / Contract: 5500023616Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0491
Rassas2018PO / Contract: 5500023638Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0490
Rassas2018PO / Contract: 5500023651Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0489
Rassas2018PO / Contract: 5500023661Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0488
Rassas2018PO / Contract: 5500023759Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0487
Rassas2018PO / Contract: 5500023772Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0486
Rassas2018PO / Contract: 5500023866Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0485
Rassas2018PO / Contract: 5500023884Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0484
Rassas2018PO / Contract: 5500023885Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0483
Rassas2018PO / Contract: 5500023903Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0482
Rassas2018PO / Contract: 5500023955Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0481
Rassas2018PO / Contract: 5500023957Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0480
Rassas2018PO / Contract: 5500024015Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0479
Rassas2018PO / Contract: 5500024016Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0478
Rassas2018PO / Contract: 5500024037Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0477
Rassas2018PO / Contract: 5500024047Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0476
Rassas2018PO / Contract: 5500024048Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0475
Rassas2018PO / Contract: 5500024089Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0474
Rassas2018PO / Contract: 5500024092Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0473
Rassas2018PO / Contract: 5500024093Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0472
Rassas2018PO / Contract: 5500024111Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0471
Rassas2018PO / Contract: 5500024206Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0470
Rassas2018PO / Contract: 5500024209Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0469
Rassas2018PO / Contract: 5500024222Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0468
Rassas2018PO / Contract: 5500024306Completed

Under Three-Year Long-Term ARC Contract at SAAC

0467
Rassas2018PO / Contract: 5500024354Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0466
Rassas2018PO / Contract: 5500024360Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0465
Rassas2018PO / Contract: 5500024422Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0464
Rassas2018PO / Contract: 5500024437Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0463
Rassas2018PO / Contract: 5500024438Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0462
Rassas2018PO / Contract: 5500024439Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0461
Rassas2018PO / Contract: 5500024440Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0460
Rassas2018PO / Contract: 5500024441Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0459
Rassas2018PO / Contract: 5500024442Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0458
Rassas2018PO / Contract: 5500024473Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0457
Rassas2018PO / Contract: 5500024476Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0456
Rassas2018PO / Contract: 5500024547Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0455
Rassas2018PO / Contract: 5500024556Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0454
Rassas2018PO / Contract: 5500024662Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0453
Rassas2018PO / Contract: 5500024663Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0452
Rassas2018PO / Contract: 5500024719Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0451
Rassas2018PO / Contract: 5500024764Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0450
Rassas2018PO / Contract: 5500024766Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0449
Rassas2018PO / Contract: 5500024796Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0448
Rassas2018PO / Contract: 5500024797Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0447
Rassas2018PO / Contract: 5500024798Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0446
Rassas2018PO / Contract: 5500024820Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0445
Rassas2018PO / Contract: 5500024821Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0444
Rassas2018PO / Contract: 5500024947Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0443
Rassas2018PO / Contract: 5500024979Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0442
Rassas2018PO / Contract: 5500024982Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0441
Rassas2018PO / Contract: 5500025046Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0440
Rassas2018PO / Contract: 5500025048Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0439
Rassas2018PO / Contract: 5500025049Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0438
Rassas2018PO / Contract: 5500025050Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0437
Rassas2018PO / Contract: 5500025123Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0436
Rassas2018PO / Contract: 5500025147Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0435
Rassas2018PO / Contract: 5500025165Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0434
Rassas2018PO / Contract: 5500025206Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0433
Rassas2018PO / Contract: 5500025207Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0432
Rassas2018PO / Contract: 5500025228Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0431
Rassas2018PO / Contract: 5500025239Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0430
Rassas2018PO / Contract: 5500025264Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0429
Rassas2018PO / Contract: 5500025268Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0428
Rassas2018PO / Contract: 5500025269Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0427
Rassas2018PO / Contract: 5500025270Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0426
Rassas2018PO / Contract: 5500025271Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0425
Rassas2018PO / Contract: 5500025272Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0424
Rassas2018PO / Contract: 5500025273Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0423
Rassas2018PO / Contract: 5500025317Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0422
Rassas2018PO / Contract: 5500025355Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0421
Rassas2018PO / Contract: 5500025445Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0420
Rassas2018PO / Contract: 5500025540Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0419
Rassas2018PO / Contract: 5500025634Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0418
Rassas2018PO / Contract: 5500025658Completed

Under Three-Year Long-Term ARC Contract at SAAC

0417
Rassas2018PO / Contract: 5500025693Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0416
Rassas2018PO / Contract: 5500025835Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0415
Rassas2018PO / Contract: 5500025841Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0414
Rassas2018PO / Contract: 5500025868Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0413
Rassas2018PO / Contract: 5500025869Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0412
Rassas2018PO / Contract: 5500025897Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0411
Rassas2018PO / Contract: 5500025914Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0410
Rassas2018PO / Contract: 5500025933Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0409
Rassas2018PO / Contract: 5500025945Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0408
Rassas2018PO / Contract: 5500026130Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0407
Rassas2018PO / Contract: 5500026131Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0406
Rassas2018PO / Contract: 5500026132Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0405
Rassas2018PO / Contract: 5500026133Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0404
Rassas2018PO / Contract: 5500026143Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0403
Rassas2018PO / Contract: 5500026188Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0402
Rassas2018PO / Contract: 5500026189Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0401
Rassas2018PO / Contract: 5500026212Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0400
Rassas2018PO / Contract: 5500026219Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0399
Rassas2018PO / Contract: 5500026223Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0398
Rassas2018PO / Contract: 5500026268Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0397
Rassas2018PO / Contract: 5500026320Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0396
Rassas2018PO / Contract: 5500026366Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0395
Rassas2018PO / Contract: 5500026367Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0394
Rassas2018PO / Contract: 5500026368Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0393
Rassas2018PO / Contract: 5500026387Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0392
Rassas2018PO / Contract: 5500026405Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0391
Rassas2018PO / Contract: 5500026449Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0390
Rassas2018PO / Contract: 5500026456Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0389
Rassas2018PO / Contract: 5500026485Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0388
Rassas2018PO / Contract: 5500026584Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0387
Rassas2018PO / Contract: 5500026686Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0386
Rassas2018PO / Contract: 5500026687Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0385
Rassas2018PO / Contract: 5500026708Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0384
Rassas2018PO / Contract: 5500026714Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0383
Rassas2018PO / Contract: 5500026734Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0382
Rassas2018PO / Contract: 5500026796Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0381
Rassas2018PO / Contract: 5500026802Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0380
Rassas2018PO / Contract: 5500026803Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0379
Rassas2018PO / Contract: 5500026805Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0378
Rassas2018PO / Contract: 5500026807Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0377
Rassas2018PO / Contract: 5500026810Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0376
Rassas2018PO / Contract: 5500026812Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0375
Rassas2018PO / Contract: 5500026895Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0374
Rassas2018PO / Contract: 5500026926Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0373
Rassas2018PO / Contract: 5500026980Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0372
Rassas2018PO / Contract: 5500026991Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0371
Rassas2018PO / Contract: 5500026992Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0370
Rassas2018PO / Contract: 5500027034Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0369
Rassas2018PO / Contract: 5500027035Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0368
Rassas2018PO / Contract: 5500027040Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0367
Rassas2018PO / Contract: 5500027043Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0366
Rassas2018PO / Contract: 5500027068Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0365
Rassas2018PO / Contract: 5500027069Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0364
Rassas2018PO / Contract: 5500027070Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0363
Rassas2018PO / Contract: 5500027111Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0362
Rassas2018PO / Contract: 5500027113Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0361
Rassas2018PO / Contract: 5500027125Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0360
Rassas2018PO / Contract: 5500027127Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0359
Rassas2018PO / Contract: 5500027134Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0358
Rassas2018PO / Contract: 5500027135Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0357
Rassas2018PO / Contract: 5500027154Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0356
Rassas2018PO / Contract: 5500027169Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0355
Rassas2018PO / Contract: 5500027221Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0354
Rassas2018PO / Contract: 5500027237Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0353
Rassas2018PO / Contract: 4500082808Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0352
Rassas2018PO / Contract: 5500027305Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0351
Rassas2018PO / Contract: 5500027320Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0350
Rassas2018PO / Contract: 5500027336Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0349
Rassas2018PO / Contract: 5500027350Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0348
Rassas2018PO / Contract: 5500027385Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0347
Rassas2018PO / Contract: 5500027386Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0346
Rassas2018PO / Contract: 5500027419Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0345
Rassas2018PO / Contract: 5500027421Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0344
Rassas2018PO / Contract: 5500027425Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0343
Rassas2018PO / Contract: 5500027446Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0342
Rassas2018PO / Contract: 5500027477Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0341
Rassas2018PO / Contract: 5500027680Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0340
Rassas2018PO / Contract: 5500027689Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0339
Rassas2018PO / Contract: 5500027692Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0338
Rassas2018PO / Contract: 5500027761Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0337
Rassas2018PO / Contract: 5500027679Completed

Material receiving inspection and traceability control at project sites.

0336
Rassas2018PO / Contract: 5500027366Completed

Installation of permanent pipe supports, guides, anchors and spring hangers.

0335
Rassas2018PO / Contract: 5500027215Completed

Pressure testing and certification of repaired industrial valves.

0334
Rassas2018PO / Contract: 5500027112Completed

Replacement of damaged instrument tubing, manifolds and fittings.

0333
Rassas2018PO / Contract: 5500027036Completed

Surface preparation and protective coating of industrial steel structures.

0332
Rassas2018PO / Contract: 5500026827Completed

Testing and rectification of insulating joints, isolation flanges, pipeline bonds and stray-current interference.

0331
Rassas2018PO / Contract: 5500026770Completed

Testing of process alarms, interlocks and emergency shutdown functions.

0330
Rassas2018PO / Contract: 5500026471Completed

Civil and structural design of foundations for pumps, vessels and compressors.

0329
Rassas2018PO / Contract: 5500026327Completed

Replacement of exchanger channel covers, gaskets and fasteners.

0328
Rassas2018PO / Contract: 5500026172Completed

Circuit-breaker inspection, testing and mechanical servicing.

0327
Rassas2018PO / Contract: 5500025915Completed

Replacement of corroded process piping during scheduled shutdowns.

0326
Rassas2018PO / Contract: 5500025803Completed

Modification and strengthening of piping supports for rerouted lines and increased operating loads.

0325
Rassas2018PO / Contract: 5500025291Completed

Installation and termination of instrument and control cables.

0324
Rassas2018PO / Contract: 5500025258Completed

Cooling-tower basin concrete repair and waterproofing.

0323
Rassas2018PO / Contract: 5500025093Completed

Phased-array ultrasonic testing of critical welded joints.

0322
Rassas2018PO / Contract: 5500024862Completed

Design of pipe racks, access platforms, ladders and equipment-support structures.

0321
Rassas2018PO / Contract: 5500024763Completed

Overhaul and alignment of centrifugal pumps and electric motors.

0320
Rassas2018PO / Contract: 5500024443Completed

Rehabilitation of existing cathodic-protection systems, including anode beds, test stations, cables and reference electrodes.

0319
Rassas2018PO / Contract: 5500024436Completed

Arc-flash assessment and preparation of electrical equipment hazard labels.

0318
Rassas2018PO / Contract: 5500024116Completed

Fabrication and installation of carbon-steel process piping.

0317
Rassas2018PO / Contract: 5500024025Completed

Maintenance and troubleshooting of automatic tank-gauging systems.

0316
Rassas2018PO / Contract: 5500023867Completed

Application of chemical-resistant coatings to concrete surfaces.

0315
Rassas2018PO / Contract: 5500023601Completed

Welding inspection and quality control for piping fabrication works.

0314
Rassas2018PO / Contract: 5500023312Completed

Correction of piping misalignment and excessive movement caused by failed or displaced supports.

0313
Rassas2018PO / Contract: 5500023117Completed

Replacement of vessel internals, trays, demisters and distributors.

0312
Rassas2018PO / Contract: 5500022924Completed

Installation of medium-voltage and low-voltage power cables.

0311
Rassas2018PO / Contract: 5500022647Completed

Cleaning and maintenance of cooling-tower basins and water systems.

0310
Rassas2018PO / Contract: 5500022506Completed

Detailed piping design for installing new process equipment at TASNEE facilities.

0309
Rassas2018PO / Contract: 5500022168Completed

Mechanical-completion inspection and preparation of punch lists.

0308
Rassas2018PO / Contract: 5500021929Completed

Replacement of isolation valves, check valves and safety relief valves.

0307
Rassas2018PO / Contract: 5500021676Completed

Direct-current voltage-gradient surveys for identifying buried pipeline coating defects.

0306
Rassas2018PO / Contract: 5500021285Completed

DCS hardware replacement and control-system software updates.

0305
Rassas2018PO / Contract: 5500021025Completed

Rehabilitation of cracked reinforced-concrete equipment foundations.

0304
Rassas2018PO / Contract: 5500020888Completed

Preventive maintenance of turbines, compressors and rotating machinery.

0303
Rassas2018PO / Contract: 5500020704Completed

Repair of pipe-support steel structures, baseplates, anchor bolts and concrete pedestals.

0302
Rassas2018PO / Contract: 5500020304Completed

Replacement of deteriorated underground GRP, RTR and HDPE pipelines.

0301
Rassas2018PO / Contract: 5500019953Completed

Calibration and testing of gas detectors, flame detectors and alarm devices.

0300
Rassas2018PO / Contract: 5500019630Completed

Hydraulic assessment and line sizing for plant utility-water networks.

0299
Rassas2018PO / Contract: 5500019405Completed

Retubing and mechanical repair of shell-and-tube heat exchangers.

0298
Rassas2018PO / Contract: 5500019219Completed

Fabrication and installation of trunnions, dummy legs, pipe shoes, guides, anchors and line stops.

0297
Rassas2018PO / Contract: 5500019076Completed

Cable glanding, termination and testing for electrical equipment.

0296
Rassas2018PO / Contract: 5500018895Completed

Replacement of cooling-tower fills, drift eliminators, louvers and nozzles.

0295
Rassas2018PO / Contract: 5500018244Completed

Scaffolding inspection and safety certification during shutdowns.

0294
Rassas2018PO / Contract: 5500018122Completed

Replacement of damaged expansion joints and flexible piping connections.

0293
Rassas2018PO / Contract: 5500017717Completed

Fire-and-gas detection system design for process and storage areas.

0292
Rassas2018PO / Contract: 5500017574Completed

Laser alignment of pumps, motors, compressors and rotating equipment.

0291
Rassas2018PO / Contract: 5500069351Completed

Configuration of fiber optic backbone infrastructure, ensuring fast and reliable connections between data centers and remote facilities.

0290
Rowad Global Packaging Company2018PO / Contract: 5500069318Completed

IP telephony and network switch setup, providing seamless voice and data communication with secure and scalable networking solutions.

0289
Technical Tetravalent Lead Smelting Plant2018PO / Contract: 5500068665Completed

Setup and maintenance of scalable IP video surveillance solutions, allowing for remote access and real-time incident tracking.

0288
National Lead Smelting Company2018PO / Contract: 5500068225Completed

Setup and maintenance of advanced CCTV surveillance systems, enhancing facility security with high-definition video capture and remote monitoring.

0287
Rassas2018PO / Contract: 5500067693Completed

Outside Plant (OSP) works including trenching, ducting, and cable laying, for underground and inter-building connectivity.

0286
Technical Tetravalent Lead Smelting Plant2018PO / Contract: 5500066149Completed

CCTV and access control system installation and integration, enhancing security and monitoring capabilities.

0285
RIG (Rowad International Geosynthetics Company)2018PO / Contract: 5500065880Completed

CCTV system recording verification and storage backup checks, ensuring security data integrity.

0284
RIG (Rowad International Geosynthetics Company)2018PO / Contract: 5500065027Completed

Inspection and repair of outdoor lighting poles and cabling, ensuring safety and visibility in external areas.

0283
National Lead Smelting Company2018PO / Contract: 5500064149Completed

UPS system maintenance and battery health checks, ensuring uninterrupted power for critical systems.

0282
National Lead Smelting Company2018PO / Contract: 5500063557Completed

BMS controller health check and diagnostics, ensuring stable and responsive building management operations.

0281
Taldeen Plastic Solution2018PO / Contract: 5500063379Completed

Plumbing and drainage system maintenance, ensuring uninterrupted flow and preventing blockages in facility pipelines.

0280
Technical Tetravalent Lead Smelting Plant2018PO / Contract: 5500062525Completed

Landscaping and green area maintenance, enhancing environmental aesthetics and compliance with site upkeep standards.

0279
SEPC (Saudi Ethylene and Polyethylene Company)2018PO / Contract: 5500062256Completed

Busbar system inspection and tightening, maintaining conductivity and reducing the risk of electrical faults.

0278
SAPCO (Saudi Acrylic Polymer Company)2018PO / Contract: 5500062224Completed

Flange connection torqueing and sealing, achieving leak-free connections and maintaining system integrity.

0277
Saudi Polyolefin Company2018PO / Contract: 5500061472Completed

Fire suppression system recharging and refilling, ensuring readiness for future use by recharging systems after servicing or emergency use.

0276
Saudi Acrylic Monomer Company2018PO / Contract: 5500061452Completed

BMS energy management optimization, monitoring energy usage to improve efficiency and reduce costs during routine operations and shutdowns.

0275
Saudi Butanol Company2018PO / Contract: 5500060488Completed

Fire alarm system inspection and maintenance, ensuring all components are functioning correctly during routine maintenance or shutdowns.

0274
TASNEE2018PO / Contract: 4500099211Completed

Replacement and re-calibration of faulty or outdated instruments, meeting operational standards during plant turnarounds.

0273
Saudi Polyolefin Company2018PO / Contract: 5500060367Completed

Installation of analyzer shelters and utilities, ensuring safe and effective operation of analytical instruments during shutdowns or routine maintenance.

0272
Saudi Acrylic Acid Company2018PO / Contract: 5500059952Completed

Installation of field instruments (pressure, temperature, level, flow), ensuring proper calibration, adjustments, and replacements during routine maintenance or plant shutdowns.

0271
SAPCO (Saudi Acrylic Polymer Company)2018PO / Contract: 5500059678Completed

Grouting works for machine foundations and anchor bolts to enhance stability.

0270
Saudi Butanol Company2018PO / Contract: 5500059628Completed

RCC trench and precast cover installation for construction and repair of RCC trenches with precast covers.

0269
Saudi Polyolefin Company2018PO / Contract: 5500059610Completed

Skid fabrication and mechanical package assembly.

0268
Saudi Butanol Company2018PO / Contract: 5500058981Completed

Piping system hydrotesting, flushing, and pre-commissioning.

0267
TASNEE2018PO / Contract: 5500024260Completed

Turnaround Manpower services in LDPE Plant

0266
SAHARA2018PO / Contract: 4500027126Completed

PMC Services

0265
TASNEE2017PO / Contract: 5500010852Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0264
TASNEE2017PO / Contract: 5500010853Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0263
TASNEE2017PO / Contract: 5500010859Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0262
TASNEE2017PO / Contract: 5500010860Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0261
TASNEE2017PO / Contract: 5500010922Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0260
TASNEE2017PO / Contract: 5500010945Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0259
TASNEE2017PO / Contract: 4500054269Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0258
TASNEE2017PO / Contract: 4500054274Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0257
TASNEE2017PO / Contract: 5500011028Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0256
TASNEE2017PO / Contract: 5500011029Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0255
TASNEE2017PO / Contract: 5500011054Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0254
TASNEE2017PO / Contract: 5500011070Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0253
TASNEE2017PO / Contract: 4500054349Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0252
TASNEE2017PO / Contract: 4500054363Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0251
TASNEE2017PO / Contract: 4500054534Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0250
TASNEE2017PO / Contract: 4500054604Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0249
TASNEE2017PO / Contract: 5500011399Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0248
TASNEE2017PO / Contract: 5500011461Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0247
TASNEE2017PO / Contract: 5500011464Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0246
TASNEE2017PO / Contract: 5500011465Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0245
TASNEE2017PO / Contract: 5500011466Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0244
TASNEE2017PO / Contract: 5500011498Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0243
TASNEE2017PO / Contract: 5500011558Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0242
TASNEE2017PO / Contract: 5500011561Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0241
TASNEE2017PO / Contract: 4500055929Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0240
TASNEE2017PO / Contract: 5500012005Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0239
TASNEE2017PO / Contract: 5500012007Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0238
TASNEE2017PO / Contract: 5500012048Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0237
TASNEE2017PO / Contract: 5500012049Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0236
TASNEE2017PO / Contract: 5500012050Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0235
TASNEE2017PO / Contract: 5500012069Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0234
TASNEE2017PO / Contract: 4500056629Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0233
TASNEE2017PO / Contract: 5500012182Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0232
TASNEE2017PO / Contract: 5500012212Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0231
TASNEE2017PO / Contract: 5500012292Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0230
TASNEE2017PO / Contract: 5500012314Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0229
TASNEE2017PO / Contract: 5500012319Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0228
TASNEE2017PO / Contract: 4500057104Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0227
TASNEE2017PO / Contract: 5500012339Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0226
TASNEE2017PO / Contract: 5500012353Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0225
TASNEE2017PO / Contract: 5500012411Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0224
TASNEE2017PO / Contract: 5500012444Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0223
TASNEE2017PO / Contract: 5500012445Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0222
TASNEE2017PO / Contract: 5500012450Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0221
TASNEE2017PO / Contract: 5500012473Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0220
TASNEE2017PO / Contract: 4800015562Completed

Under Three-Year Long-Term ARC Contract at SAAC

0219
TASNEE2017PO / Contract: 5500012595Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0218
TASNEE2017PO / Contract: 5500012625Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0217
TASNEE2017PO / Contract: 5500012656Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0216
TASNEE2017PO / Contract: 5500012658Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0215
TASNEE2017PO / Contract: 5500012688Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0214
TASNEE2017PO / Contract: 5500012723Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0213
TASNEE2017PO / Contract: 5500012724Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0212
TASNEE2017PO / Contract: 5500012739Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0211
TASNEE2017PO / Contract: 5500012833Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0210
TASNEE2017PO / Contract: 5500012874Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0209
TASNEE2017PO / Contract: 5500012948Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0208
TASNEE2017PO / Contract: 5500012973Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0207
TASNEE2017PO / Contract: 5500012984Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0206
TASNEE2017PO / Contract: 5500013017Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0205
TASNEE2017PO / Contract: 5500013034Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0204
TASNEE2017PO / Contract: 4500059025Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0203
TASNEE2017PO / Contract: 5500013070Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0202
TASNEE2017PO / Contract: 5500013096Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0201
TASNEE2017PO / Contract: 5500013097Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0200
TASNEE2017PO / Contract: 5500013269Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0199
TASNEE2017PO / Contract: 5500013274Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0198
TASNEE2017PO / Contract: 5500013275Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0197
TASNEE2017PO / Contract: 5500013279Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0196
TASNEE2017PO / Contract: 5500013281Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0195
TASNEE2017PO / Contract: 5500013286Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0194
TASNEE2017PO / Contract: 5500013393Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0193
TASNEE2017PO / Contract: 5500013427Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0192
TASNEE2017PO / Contract: 5500013444Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0191
TASNEE2017PO / Contract: 5500013459Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0190
TASNEE2017PO / Contract: 5500013485Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0189
TASNEE2017PO / Contract: 5500013547Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0188
TASNEE2017PO / Contract: 5500013602Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0187
TASNEE2017PO / Contract: 5500013646Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0186
TASNEE2017PO / Contract: 5500013652Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0185
TASNEE2017PO / Contract: 4500060691Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0184
TASNEE2017PO / Contract: 5500013680Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0183
TASNEE2017PO / Contract: 5500013722Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0182
TASNEE2017PO / Contract: 5500013773Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0181
TASNEE2017PO / Contract: 5500013774Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0180
TASNEE2017PO / Contract: 5500013775Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0179
TASNEE2017PO / Contract: 5500013777Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0178
TASNEE2017PO / Contract: 5500013790Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0177
TASNEE2017PO / Contract: 5500013867Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0176
TASNEE2017PO / Contract: 5500013940Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0175
TASNEE2017PO / Contract: 5500013950Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0174
TASNEE2017PO / Contract: 4500061544Completed

Under Three-Year Long-Term ARC Contract at NPIC Plant

0173
TASNEE2017PO / Contract: 5500014302Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0172
TASNEE2017PO / Contract: 5500014398Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0171
TASNEE2017PO / Contract: 5500014436Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0170
TASNEE2017PO / Contract: 5500014497Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0169
TASNEE2017PO / Contract: 5500014500Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0168
TASNEE2017PO / Contract: 5500014578Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0167
TASNEE2017PO / Contract: 5500014612Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0166
TASNEE2017PO / Contract: 5500014740Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0165
TASNEE2017PO / Contract: 5500014779Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0164
TASNEE2017PO / Contract: 5500014790Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0163
TASNEE2017PO / Contract: 5500014802Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0162
TASNEE2017PO / Contract: 5500014849Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0161
TASNEE2017PO / Contract: 5500014850Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0160
TASNEE2017PO / Contract: 5500014914Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0159
TASNEE2017PO / Contract: 5500014916Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0158
TASNEE2017PO / Contract: 5500014949Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0157
TASNEE2017PO / Contract: 5500014962Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0156
TASNEE2017PO / Contract: 5500014963Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0155
TASNEE2017PO / Contract: 5500014964Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0154
TASNEE2017PO / Contract: 5500014972Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0153
TASNEE2017PO / Contract: 5500015018Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0152
TASNEE2017PO / Contract: 5500015058Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0151
TASNEE2017PO / Contract: 5500015059Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0150
TASNEE2017PO / Contract: 5500015128Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0149
TASNEE2017PO / Contract: 5500015170Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0148
TASNEE2017PO / Contract: 5500015294Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0147
TASNEE2017PO / Contract: 5500015305Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0146
TASNEE2017PO / Contract: 5500015328Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0145
TASNEE2017PO / Contract: 5500015519Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0144
TASNEE2017PO / Contract: 5500015606Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0143
TASNEE2017PO / Contract: 5500015623Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0142
TASNEE2017PO / Contract: 5500015625Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0141
TASNEE2017PO / Contract: 5500015662Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0140
TASNEE2017PO / Contract: 5500015693Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0139
TASNEE2017PO / Contract: 5500015717Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0138
TASNEE2017PO / Contract: 5500015872Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0137
TASNEE2017PO / Contract: 5500015873Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0136
TASNEE2017PO / Contract: 5500015888Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0135
TASNEE2017PO / Contract: 5500016021Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0134
TASNEE2017PO / Contract: 5500016031Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0133
TASNEE2017PO / Contract: 5500016032Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0132
TASNEE2017PO / Contract: 5500016033Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0131
TASNEE2017PO / Contract: 5500016139Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0130
TASNEE2017PO / Contract: 5500016145Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0129
TASNEE2017PO / Contract: 5500016149Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0128
TASNEE2017PO / Contract: 5500016176Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0127
TASNEE2017PO / Contract: 5500016178Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0126
TASNEE2017PO / Contract: 5500016215Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0125
TASNEE2017PO / Contract: 5500016218Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0124
TASNEE2017PO / Contract: 5500016353Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0123
TASNEE2017PO / Contract: 5500016357Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0122
TASNEE2017PO / Contract: 5500016358Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0121
TASNEE2017PO / Contract: 5500016360Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0120
TASNEE2017PO / Contract: 5500016361Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0119
TASNEE2017PO / Contract: 5500016362Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0118
TASNEE2017PO / Contract: 5500016443Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0117
TASNEE2017PO / Contract: 5500016452Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0116
TASNEE2017PO / Contract: 5500016453Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0115
TASNEE2017PO / Contract: 5500016474Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0114
TASNEE2017PO / Contract: 5500016491Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0113
TASNEE2017PO / Contract: 5500016512Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0112
TASNEE2017PO / Contract: 5500016576Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0111
TASNEE2017PO / Contract: 5500016610Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0110
TASNEE2017PO / Contract: 5500016614Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0109
TASNEE2017PO / Contract: 5500016727Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0108
TASNEE2017PO / Contract: 5500016742Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0107
TASNEE2017PO / Contract: 5500016797Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0106
TASNEE2017PO / Contract: 5500016959Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0105
TASNEE2017PO / Contract: 5500017004Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0104
TASNEE2017PO / Contract: 5500017086Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0103
TASNEE2017PO / Contract: 5500017090Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0102
TASNEE2017PO / Contract: 5500017091Completed

Under Three-Year Long-Term ARC Contract at SAPCO

0101
TASNEE2017PO / Contract: 5500017218Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0100
TASNEE2017PO / Contract: 5500017234Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0099
TASNEE2017PO / Contract: 5500017241Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0098
TASNEE2017PO / Contract: 5500017246Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0097
TASNEE2017PO / Contract: 5500017408Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0096
TASNEE2017PO / Contract: 5500017247Completed

Structural repair of industrial platforms and maintenance walkways.

0095
TASNEE2017PO / Contract: 5500017006Completed

Installation of impressed-current cathodic-protection systems for underground pipelines.

0094
TASNEE2017PO / Contract: 5500016609Completed

Preventive maintenance and troubleshooting of plant field instruments.

0093
TASNEE2017PO / Contract: 5500016363Completed

Repair of industrial roads, drainage channels and concrete pavements.

0092
TASNEE2017PO / Contract: 5500016292Completed

Ultrasonic thickness measurement and corrosion mapping of process equipment.

0091
TASNEE2017PO / Contract: 5500016077Completed

Piping stress analysis and support design for high-temperature process lines.

0090
TASNEE2017PO / Contract: 5500015809Completed

Internal cleaning and maintenance of process vessels and separators.

0089
TASNEE2017PO / Contract: 5500015329Completed

Replacement of obsolete MCC feeders, breakers and protection devices.

0088
TASNEE2017PO / Contract: 5500015019Completed

Chemical cleaning and flushing of process and utility pipelines.

0087
TASNEE2017PO / Contract: 5500014915Completed

Installation and load-setting adjustment of variable spring supports for high-temperature piping.

0086
TASNEE2017PO / Contract: 5500014647Completed

Preparation of instrument indexes, data sheets, loop diagrams and hook-up drawings.

0085
TASNEE2017PO / Contract: 5500014371Completed

Overhaul, calibration and testing of process control valves.

0084
TASNEE2017PO / Contract: 5500013776Completed

Roof waterproofing and insulation repair for industrial buildings.

0083
TASNEE2017PO / Contract: 5500013651Completed

Installation of sacrificial-anode cathodic-protection systems for buried piping and storage tanks.

0082
TASNEE2017PO / Contract: 5500013403Completed

HSE supervision and permit-to-work monitoring during plant maintenance.

0081
TASNEE2017PO / Contract: 4500059414Completed

Heat-exchanger bundle removal, cleaning, inspection and reinstatement.

0080
TASNEE2017PO / Contract: 5500012977Completed

ETAP load-flow, short-circuit and protection-coordination studies.

0079
TASNEE2017PO / Contract: 5500012706Completed

Hot tapping and tie-in works on operational utility-water pipelines.

0078
TASNEE2017PO / Contract: 5500012478Completed

Radiographic inspection of piping and pressure-vessel welds.

0077
TASNEE2017PO / Contract: 5500012326Completed

Repair and replacement of cooling-tower structural members.

0076
TASNEE2017PO / Contract: 5500012140Completed

Replacement of corroded pipe supports and structural attachments.

0075
TASNEE2017PO / Contract: 5500011757Completed

Installation and calibration of pressure, temperature, flow and level transmitters.

0074
TASNEE2017PO / Contract: 5500011441Completed

Concrete inspection and repair of process-area foundations.

0073
TASNEE2017PO / Contract: 5500011041Completed

Close-interval potential surveys for underground pipeline networks.

0072
TASNEE2017PO / Contract: 5500010921Completed

Inspection and mechanical repair of pressure vessels during shutdown.

0071
NBC (National Batteries Company)2017PO / Contract: 5500044755Completed

Fire detection and suppression system maintenance, ensuring safety compliance and operational readiness.

0070
NBC (National Batteries Company)2017PO / Contract: 5500044507Completed

Janitorial and sanitation services in industrial zones, maintaining hygiene standards and operational cleanliness.

0069
NBC (National Batteries Company)2017PO / Contract: 5500043943Completed

Building automation system (BAS) servicing, optimizing control over building utilities and energy efficiency.

0068
NBC (National Batteries Company)2017PO / Contract: 5500043879Completed

Generator operation and preventive maintenance, ensuring backup power systems remain reliable and functional.

0067
EAST GAS2017PO / Contract: EGCL/115/2017Completed

Breaker testing and relay calibration in switchgear panels, ensuring protective devices function accurately.

0066
Taldeen Plastic Solution2017PO / Contract: 5500057705Completed

Deployment of high-speed fiber optic networks, ensuring seamless connectivity between locations with minimal latency and maximum reliability.

0065
Rowad Global Packaging Company2017PO / Contract: 5500057617Completed

FTTx deployment including FTTH, FTTB, and FTTP, enabling high-speed fiber connectivity to premises and buildings.

0064
Taldeen Plastic Solution2017PO / Contract: 5500057589Completed

Installation and maintenance of data centers, servers, and backup systems, supporting high availability and disaster recovery.

0063
NBC (National Batteries Company)2017PO / Contract: 5500045115Completed

Inspection and testing of water leak detection systems, preventing damage to building infrastructure.

0062
NBC (National Batteries Company)2017PO / Contract: 5500045098Completed

Power factor correction system maintenance, optimizing electrical efficiency and reducing energy costs.

0061
NBC (National Batteries Company)2017PO / Contract: 5500044885Completed

Inspection and testing of emergency lighting systems, ensuring proper operation during power outages.

0060
Saudi Acrylic Monomer Company2017PO / Contract: 5500043731Completed

RTR pipe support installation using non-metallic and metallic materials, ensuring proper alignment and vibration control.

0059
Saudi Butanol Company2017PO / Contract: 5500043723Completed

Fire suppression system modifications, making adjustments or improvements to enhance system efficiency and compliance during plant turnarounds.

0058
EAST GAS2017PO / Contract: EGCL/112/2017Completed

BMS system diagnostics and troubleshooting, resolving issues within the system to maintain continuous building operations during turnarounds.

0057
SAPCO (Saudi Acrylic Polymer Company)2017PO / Contract: 5500043460Completed

Replacement of fire alarm detectors and devices, ensuring compliance with safety standards and operational reliability during maintenance activities.

0056
Saudi Acrylic Acid Company2017PO / Contract: 5500043459Completed

Integration of new instrumentation and control systems, implemented during major maintenance and shutdown activities to improve system efficiency.

0055
SEPC (Saudi Ethylene and Polyethylene Company)2017PO / Contract: 5500042356Completed

Vibration monitoring system installation, supporting the monitoring of critical equipment during shutdowns and turnarounds to enhance long-term operational health.

0054
TASNEE2017PO / Contract: 5500024360Completed

Shutdown Manpower Services in PP Plant TASNEE

0053
TASNEE2017PO / Contract: 5500020765Completed

Shutdown Manpower Services in SAP Plant TASNEE

0052
TASNEE2017PO / Contract: 4500099200Completed

Performing loop checking and commissioning support, verifying system integrity and functionality during shutdown and turnarounds.

0051
Saudi Butanol Company2017PO / Contract: 5500042328Completed

Fence and boundary wall repairs through repair and restoration of perimeter fences and boundary walls.

0050
SAPCO (Saudi Acrylic Polymer Company)2017PO / Contract: 5500041801Completed

Concrete foundation repairs involving restoration of concrete foundations, including equipment pads, pipe racks, and transformers.

0049
Saudi Polyolefin Company2017PO / Contract: 5500041796Completed

Stainless steel piping works for process and utility systems.

0048
TASNEE2017PO / Contract: 5500020304Completed

Global Shutdown Manpower Services- HDPE, LDPE,UTOS, CRACKER Plants

0047
TASNEE2017PO / Contract: 5500019715Completed

Turnaround Manpower services in AA Chemical Plant

0046
Rassas2017PO / Contract: 5500058724Completed

Integration of telecom and IT infrastructure with building management systems to enable seamless monitoring and control of facilities.

0045
ISCOSA2017PO / Contract: 5500058663Completed

Site Support service for the Turbine overhauling project at TASNEE’s Jubail plant to restore turbine performance and ensure operational reliability.

SIEMENS

0044
RIG (Rowad International Geosynthetics Company)2017PO / Contract: 5500058661Completed

Structured cabling system design and installation, ensuring efficient connectivity and network infrastructure for reliable communication.

0043
NBC (National Batteries Company)2017PO / Contract: 5500058067Completed

Creation and maintenance of secure wireless networks, facilitating seamless communication and data exchange across large-scale industrial sites.

0042
TASNEE2017PO / Contract: 4500073620Completed

PMC Services

0041
TASNEE2017PO / Contract: 4500071622Completed

PMC Services

0040
TASNEE2016PO / Contract: 4600004603Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0039
TASNEE2016PO / Contract: 5500009113Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0038
TASNEE2016PO / Contract: 5500009119Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0037
TASNEE2016PO / Contract: 5500009161Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0036
TASNEE2016PO / Contract: 5500009289Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0035
TASNEE2016PO / Contract: 5500009295Completed

Under Three-Year Long-Term ARC Contract at SPC Plant

0034
TASNEE2016PO / Contract: 5500009325Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0033
TASNEE2016PO / Contract: 5500009579Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0032
TASNEE2016PO / Contract: 5500009710Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0031
TASNEE2016PO / Contract: 5500009835Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0030
TASNEE2016PO / Contract: 5500009878Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0029
TASNEE2016PO / Contract: 5500010034Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0028
TASNEE2016PO / Contract: 5500010035Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0027
TASNEE2016PO / Contract: 5500010044Completed

Under Three-Year Long-Term ARC Contract at SEPC Plant

0026
TASNEE2016PO / Contract: 5500010123Completed

Under Three-Year Long-Term ARC Contract at SAMCO

0025
TASNEE2016PO / Contract: 5500010673Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0024
TASNEE2016PO / Contract: 5500010675Completed

Under Three-Year Long-Term ARC Contract at SABUCO

0023
TASNEE2016PO / Contract: 5500010086Completed

Preventive maintenance and testing of power transformers.

0022
TASNEE2016PO / Contract: 5500009448Completed

Fabrication and erection of steel access platforms, ladders and handrails.

Repeat Order for Refinary operations.

0021
TASNEE2016PO / Contract: 4500072622Completed

Turnaround Manpower services in PDH Plant

0020
Saudi Acrylic Acid Company2016PO / Contract: 5500060641Completed

Cable termination and glanding for LV/MV systems, ensuring secure connections and proper insulation.

0019
Saudi Polyolefin Company2016PO / Contract: 5500060776Completed

HVAC system maintenance including chillers, ducting, and package units, ensuring efficient climate control and system performance.

0018
TASNEE2016PO / Contract: 4500092863Completed

RTR pipe installation using butt & wrap, key lock, and adhesive joint methods, ensuring reliable and durable pipeline connections.

0017
SEPC (Saudi Ethylene and Polyethylene Company)2016PO / Contract: 5500060433Completed

BMS software updates and system upgrades, improving energy efficiency and system performance during scheduled maintenance or upgrades.

0016
TASNEE2016PO / Contract: 4800005507Completed

As Built for Butanol Project , SabTank, tank terminal operator

0015
EAST GAS2016PO / Contract: EGCL/033/2016Completed

Construction of NG pipeline networks and fiber optic cables Dammam 2nd Industrial City, supporting turnkey expansion projects of gas distribution for Saudi Arabian Amiantit Company

SabTank, tank terminal operator

0014
TASNEE2016PO / Contract: 4500091913Completed

System testing and calibration of fire alarms, ensuring accuracy and reliability during periodic checks and maintenance.

0013
EAST GAS2016PO / Contract: EGCL/024/2016Completed

Long-term maintenance of instrumentation, control systems, and calibration checks under annual 3 year service contracts.

0012
Saudi Acrylic Monomer Company2016PO / Contract: 5500025208Completed

Preventative maintenance on field instruments, ensuring optimal performance and longevity during scheduled shutdowns and turnarounds.

0011
Saudi Butanol Company2016PO / Contract: 5500024205Completed

Installation and connection of instrument air tubing, ensuring proper functionality and reliable operation during maintenance activities.

0010
Saudi Acrylic Monomer Company2016PO / Contract: 5500023660Completed

Roof waterproofing and insulation repair for roof waterproofing and insulation systems.

0009
Ma’aden2016PO / Contract: AAI‑PO‑2016‑0012Completed

Complete engineering design of a material warehouse, including civil and structural calculations, detailed construction drawings, and fabrication-ready shop drawings. The scope ensures structural integrity, regulatory compliance, and readiness for execution.

Al Amara International Trading & Contracting Co. Ltd

0008
Saudi Butanol Company2016PO / Contract: 5500019325Completed

Execution of hot tapping and tie-in works on live utility water process lines to enable system expansion without shutdown

0007
Saudi Acrylic Monomer Company2016PO / Contract: 5500018881Completed

Underground pipeline repair and reinstatement (GRP, RTR, HDPE).

0006
SABIC2016PO / Contract: 4300012275Completed

Concrete Inspection and Repairing for Ammonia Plant, Al Bayrouni , Sabic

Al Bayrouni affiliate

0005
SABIC2016PO / Contract: 4501954890Completed

Inspection for FRP above Ground Piping, Al Bayrouni, Sabic

Al Bayrouni affiliate

0004
SABIC2016PO / Contract: 4300039038Completed

Building Risk Assessment On SabTank, tank terminal operator, storage facilities in both Jubail Industrial City (with up to 50 tanks and multiple marine berths) and in Yanbu (with vessel berths and tank storage)

SabTank, tank terminal operator affiliate

0003
TASNEE2016PO / Contract: CW5489Completed

Long Term Contract- ARC Contract (3 Years)

0002
SABIC2016PO / Contract: 4300031032Completed

ENRAF System Repair/Troubleshooting Serv Preventive Maintenance, Calibration, Verification (Custody transfer), Troubleshooting and Site Support Services for all types of ENRAF Automatic Tank Gauging (ATG) Systems installed at SabTank, tank terminal operator by vendor . The scope of supply and services of vendor shall include but not limited to the following 1. ENRAF ATG systems installed for all SABIC and Non-SABIC affiliates.2. Communication between CCR, LCR, Berths for ENRAF ATG systems for all SABIC and Non-SABIC affiliates.3. Interface and communication between ENRAF ATG system, SabTank, tank terminal operator, Yokogawa DCS system, GE FANUC ESD system, PLC system or any 3rd party systems.4. ENRAF ATG Calibration & Verification for Custody transfer usage. 5. Hardware & Software of ENRAF ATG system.6. Spare parts for ENRAF ATG system.7. Emergency services : Emergency call response will be 24 Hrs. X 7 days, long term Contract.

SabTank, tank terminal operator affiliate

0001
Satorp2015PO / Contract: 27806Completed

Detailed engineering and design for the installation of a new bypass control valve at the Crude Distillation Unit (CDU) of the SATORP Refinery

HK Al Sadiq

Project or partnership in mind?

Let us build the right engineering response.

Contact our team
WA